首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 636 毫秒
1.
To meet the significant increase in EVA demand to support assembly and operations of the International Space Station (ISS), NASA and industry have improved the current Shuttle Extravehicular Mobility Unit (EMU), or "space suit", configuration to meet the unique and specific requirements of an orbital-based system. The current Shuttle EMU was designed to be maintained and serviced on the ground between frequent Shuttle flights. ISS will require the EMUs to meet increased EVAs out of the Shuttle Orbiter and to remain on orbit for up to 180 days without need for regular return to Earth for scheduled maintenance or refurbishment. Ongoing Shuttle EMU improvements have increased reliability, operational life and performance while minimizing ground and on-orbit maintenance cost and expendable inventory. Modifications to both the anthropomorphic mobility elements of the Space Suit Assembly (SSA) as well as to the Primary Life Support System (PLSS) are identified and discussed. This paper also addresses the status of on-going Shuttle EMU improvements and summarizes the approach for increasing interoperability of the U.S. and Russian space suits to be utilized aboard the ISS.  相似文献   

2.
《Acta Astronautica》2007,60(12):1135-1145
Requirements are rarely static, and are ever more likely to evolve as the development time of a system stretches out and its service life increases. In this paper, we discuss the evolution of requirements for the US spacesuit, the extravehicular mobility unit (EMU), as a case study to highlight the need for flexibility in system design. We explore one fundamental environmental change, using the Space Shuttle EMU aboard the International Space Station, and the resulting EMU requirement and design changes. The EMU, like other complex systems, faces considerable uncertainty during its service life. Changes in the technical, political, or economic environment cause changes in requirements, which in turn necessitate design modifications or upgrades. We make the case that flexibility is a key attribute that needs to be embedded in the design of long-lived, complex systems to enable them to efficiently meet the inevitability of changing requirements after they have been fielded.  相似文献   

3.
Requirements are rarely static, and are ever more likely to evolve as the development time of a system stretches out and its service life increases. In this paper, we discuss the evolution of requirements for the US spacesuit, the extravehicular mobility unit (EMU), as a case study to highlight the need for flexibility in system design. We explore one fundamental environmental change, using the Space Shuttle EMU aboard the International Space Station, and the resulting EMU requirement and design changes. The EMU, like other complex systems, faces considerable uncertainty during its service life. Changes in the technical, political, or economic environment cause changes in requirements, which in turn necessitate design modifications or upgrades. We make the case that flexibility is a key attribute that needs to be embedded in the design of long-lived, complex systems to enable them to efficiently meet the inevitability of changing requirements after they have been fielded.  相似文献   

4.
NASA's microgravity fundamental physics program has used the Space Shuttle to perform high resolutions experiments in space. As we come to the end of the Shuttle era, we will begin to perform research aboard the ISS. A large stable of ground based experiments have been selected from NASA Research Announcements in a variety of disciplines. These investigations will form the backbone from which to select future flight candidates. Research in Laser Cooling and Atomic Physics will enable us to operate highly precise clocks in space. Low temperature physics experiments will use a liquid helium facility with a six-month lifetime. This facility can also support experiments in gravitational physics. Researchers in biological physics will be offered an opportunity to develop future experiments that can benefit from space experimentation. An overview of the future research directions and the benefits to the community of performing research aboard the ISS will be presented.  相似文献   

5.
《Acta Astronautica》2007,60(4-7):594-598
The International Space Station (ISS) is a multifaceted international project. Several space agencies from different countries work together in the Outer Space. This paper will illustrate the exciting questions arising from such a venture and therefore the challenge to incorporate a variety of issues into a legal order. The Paper is addressed to lawyers who need not necessarily be experts in space law, and also to space experts who have no legal background. It demonstrates the three layers of the ISS regime—from the “Intergovernmental Agreement” (IGA) as a “frame” with pillars and boundaries, over the “Memoranda of Understanding” (MOU) which rules in a more specific way, to the so-called “Implementing Arrangements” regulating the overall and single aspects of ISS in detail.The paper underlines questions of applicable jurisdiction, utilization rights and the rights on intellectual property onboard of the ISS. Furthermore the problem of liability in space flight is highlighted, also with a view to the different aspects of the liability issue, for example (internal) liability caused by programme delays (e.g. US Space Shuttle delays).In conclusion, the paper illustrates the situation of astronauts by the “Code of Conduct for the International Space Station Crew” and provides an example for the actual ISS Programme—an international cooperation in a highly demanding environment which will be a basis for future space ventures in many ways.  相似文献   

6.
The International Space Station (ISS), as the largest international science and engineering program in history, features unprecedented technical, cost, scheduling, managerial, and international complexity. A number of major milestones have been accomplished to date, including the construction of major elements of flight hardware, the development of operations and sustaining engineering centers, astronaut training, and eight Space Shuttle/Mir docking missions. International partner contributions and levels of participation have been baselined, and negotiations and discussions are nearing completion regarding bartering arrangements for services and new hardware. As ISS is successfully executed, it can pave the way for more inspiring cooperative achievements in the future.  相似文献   

7.
In the 36 years between June 1965 and February 2001, the US human space flight program has conducted 100 spacewalks, or extravehicular activities (EVAs), as NASA officially calls them. EVA occurs when astronauts wearing spacesuits travel outside their protective spacecraft to perform tasks in the space vacuum environment. US EVA started with pioneering feasibility tests during the Gemini Program. The Apollo Program required sending astronauts to the moon and performing EVA to explore the lunar surface. EVA supported scientific mission objectives of the Skylab program, but may be best remembered for repairing launch damage to the vehicle and thus saving the program. EVA capability on Shuttle was initially planned to be a kit that could be flown at will, and was primarily intended for coping with vehicle return emergencies. The Skylab emergency and the pivotal role of EVA in salvaging that program quickly promoted Shuttle EVA to an essential element for achieving mission objectives, including retrieving satellites and developing techniques to assemble and maintain the International Space Station (ISS). Now, EVA is supporting assembly of ISS. This paper highlights development of US EVA capability within the context of the overarching mission objectives of the US human space flight program.  相似文献   

8.
During the next two decades, we will establish the foundation for the 21st century's accomplishments in space. The Space Shuttle vehicle will become the cornerstone for that foundation by providing economical opportunities for space exploration and utilization.Reusability of the Shuttle vehicle is the key to its economy. The major developmental challenges encountered in the Shuttle program are typified by the complexities involved in designing the reusable propulsion and thermal protection subsystems. We successfully met such challenges and are nearing the launch of the first Shuttle orbital flight.Our immediate goal is to enter the Space Shuttle operational phase because only then will we fully understand the unique capabilities of the Shuttle. Concurrent with our effort to begin Shuttle operations are our initial efforts to expand Shuttle capabilities, extending them significantly beyond those of the current baseline system.Shuttle payload capacity and mission-duration capabilities are to increase considerably during the next decade. Just as present Shuttle performance specifications and development timetables were guided by the space program plans and forecasts of the 1960s, so will the development of long-range space programs be determined by our near-future achievements. We anticipate that the Space Shuttle will play a critical role in those achievements.  相似文献   

9.
This paper shares an interesting and unique case study of knowledge capture by the National Aeronautics and Space Administration (NASA), an ongoing project to recapture and make available the lessons learned from the Apollo lunar landing project so that those working on future projects do not have to “reinvent the wheel”. NASA’s new Constellation program, the successor to the Space Shuttle program, proposes a return to the Moon using a new generation of vehicles. The Orion Crew Vehicle and the Altair Lunar Lander will use hardware, practices, and techniques descended and derived from Apollo, Shuttle, and the International Space Station. However, the new generation of engineers and managers who will be working with Orion and Altair are largely from the decades following Apollo, and are likely not well aware of what was developed in the 1960s. In 2006, a project at NASA’s Johnson Space Center was started to find pertinent Apollo-era documentation and gather it, format it, and present it using modern tools for today’s engineers and managers. This “Apollo Mission Familiarization for Constellation Personnel” project is accessible via the web from any NASA center for those interested in learning answers to the question “how did we do this during Apollo?”  相似文献   

10.
New, innovative joint safety policies and requirements were developed in support of the Shuttle/Mir program, which is the first phase of the International Space Station program. This work has resulted in a joint multinational analysis culminating in joint certification for mission readiness. For these planning and development efforts, each nation's risk programs and individual safety practices had to be integrated into a comprehensive and compatible system that reflects the joint nature of the endeavor. This paper highlights the major incremental steps involved in planning and program integration during development of the Shuttle/Mir program. It traces the transition from early development to operational status and highlights the valuable lessons learned that apply to the International Space Station program (Phase 2). Also examined are external and extraneous factors that affected mission operations and the corresponding solutions to ensure safe and effective Shuttle/Mir missions.  相似文献   

11.
Nearly six years after the launch of the first International Space Station element, and four years after its initial occupation, the United States and our 6 international partners have made great strides in operating this impressive Earth orbiting research facility. This past year we have done so in the face of the adversity of operating without the benefit of the Space Shuttle. In his January 14, 2004, speech announcing a new vision for America's space program, President Bush affirmed the United States' commitment to completing construction of the International Space Station by 2010. The President also stated that we would focus our future research aboard the Station on the long-term effects of space travel on human biology. This research will help enable human crews to venture through the vast voids of space for months at a time. In addition, ISS affords a unique opportunity to serve as an engineering test bed for hardware and operations critical to the exploration tasks. NASA looks forward to working with our partners on International Space Station research that will help open up new pathways for future exploration and discovery beyond low Earth orbit. This paper provides an overview of the International Space Station Program focusing on a review of the events of the past year, as well as plans for next year and the future.  相似文献   

12.
Analysing Interferometer for Ambient Air (ANITA) is a flight experiment as precursor for a permanent continuous trace gas monitoring system on the International Space Station (ISS). For over 10 years, under various ESA contracts the flight experiment was defined, designed, breadboarded and set up. For the safety of the crew, ANITA can detect and quantify quasi on-line and simultaneously 32 trace gases with ppm or sub-ppm detection limits. The self-standing measurement system is based on Fourier Transform Infrared Spectrometer (FTIR) technology. The system represents a versatile air monitor allowing for the first time the detection and monitoring of trace gas dynamics of a spacecraft atmosphere. It is envisaged to accommodate ANITA in a Destiny (US LAB) Express Rack on the ISS. The transportation to the ISS is planned with the first ATV 'Jules Verne'. The options are either the Space Shuttle or the Automated Transfer Vehicle.  相似文献   

13.
The International Space Station as a microgravity research platform   总被引:2,自引:0,他引:2  
  相似文献   

14.
Many of the problems that the Space Shuttle programme has had in meeting its goals of routine and cost-effective access to space can be traced to various characteristics of the decision to develop the Space Shuttle. That decision was made through a process of bureaucratic politics, with little attention given to future users of the Shuttle. The design chosen for development was a poor compromise between demanding Pentagon and NASA requirements and a limited budget.  相似文献   

15.
The selection, definition, and development phases of a Life Sciences flight research experiment has been consistent throughout the past decade. The implementation process, however, has changed significantly within the past two years. This change is driven primarily by the shift from highly integrated, dedicated research missions on platforms with well defined processes to self contained experiments with stand alone operations on platforms which are being concurrently designed. For experiments manifested on the International Space Station (ISS) and/or on short duration missions, the more modular, streamlined, and independent the individual experiment is, the more likely it is to be successfully implemented before the ISS assembly is completed. During the assembly phase of the ISS, science operations are lower in priority than the construction of the station. After the station has been completed, it is expected that more resources will be available to perform research. The complexity of implementing investigations increases with the logistics needed to perform the experiment. Examples of logistics issues include- hardware unique to the experiment; large up and down mass and volume needs; access to crew and hardware during the ascent or descent phases; maintenance of hardware and supplies with a limited shelf life,- baseline data collection schedules with lengthy sessions or sessions close to the launch or landing; onboard stowage availability, particularly cold stowage; and extensive training where highly proficient skills must be maintained. As the ISS processes become better defined, experiment implementation will meet new challenges due to distributed management, on-orbit resource sharing, and adjustments to crew availability pre- and post-increment.  相似文献   

16.
In the recent years the Russian Orlan-M space suits have been improved as applied to their operational requirements for the ISS. A special attention is paid to enhancement of EVA crew efficiency and safety. The paper considers the main problems regarding specific features of the Russian space suit operation in the ISS, and analyses measures on their solution. In particular, the problems associated with the following are considered: enhancement of the anthropometric range for the EVA crewmembers; use of some US EMU elements and unified NASA equipment elements; Orlan-M operation support in the wide range of the ISS thermal conditions; use of Simplified Aid For Extravehicular activity Rescue (SAFER) designed as a self-rescue device, which will be used for an EVA crewmember return in the event that he (she) breaks away inadvertently from the ISS surface. The paper states the main space suit differences with reference to solution of the above problems. The paper presents briefly the design of space suit arms developed for crewmembers with small anthropometric parameters, as well as peculiarities and test results for the gloves with enhanced thermal protection. Measures on further space suit development with the purpose to improve its performances are considered.  相似文献   

17.
The International Space Station will provide an extremely high-quality, long-duration microgravity environment for the conduct of research. In addition, the ISS offers a platform for performing observations of Earth and Space from a high-inclination orbit, outside of the Earth's atmosphere. This unique environment and observational capability offers the opportunity for advancement in a diverse set of research fields. Many of these disciplines do not relate to one another, and present widely differing approaches to study, as well as different resource and operational requirements. Significant challenges exist to ensure the highest quality research return for each investigation. Requirements from different investigations must be identified, clarified, integrated and communicated to ISS personnel in a consistent manner. Resources such as power, crew time, etc. must be apportioned to allow the conduct of each investigation. Decisions affecting research must be made at the strategic level as well as at a very detailed execution level. The timing of the decisions can range from years before an investigation to real-time operations. The international nature of the Space Station program adds to the complexity. Each participating country must be assured that their interests are represented during the entire planning and operations process. A process for making decisions regarding research planning, operations, and real-time replanning is discussed. This process ensures adequate representation of all research investigators. It provides a means for timely decisions, and it includes a means to ensure that all ISS International Partners have their programmatic interests represented.  相似文献   

18.
《Acta Astronautica》2007,60(4-7):420-425
The study of internal clock systems of scorpions in weightless conditions is the goal of the SCORPI experiment. SCORPI was selected for flight on the International Space Station (ISS) and will be mounted in the European facility BIOLAB, the European Space Agency (ESA) laboratory designed to support biological experiments on micro-organisms, cells, tissue, cultures, small plants and small invertebrates. This paper outlines the main features of a breadboard designed and developed in order to allow the analysis of critical aspects of the experiment. It is a complete tool to simulate the experiment mission on ground and it can be customised, adapted and tuned to the scientific requirements. The paper introduces the SCORPI-T experiment which represents an important precursor for the success of the SCORPI on BIOLAB. The capabilities of the hardware developed show its potential use for future similar experiments in space.  相似文献   

19.
The purpose of this paper is to describe a program aimed at an early on orbit demonstration of a large space structure fabrication and assembly capability. Requirements for the demonstration concept have been formulated. The concept that has been selected to meet these requirements is a Large Space Structure Platform consisting of a triangular prism of 31.5 m length. Sensors can be mounted on this platform to perform Earth observation measurements from space. Structural elements of the platform are fabricated using an automated beam builder in the Shuttle Orbiter payload bay. Special fixtures are designed to assemble the structure with the aid of the Remote Manipulator System and two astroworkers in an EVA mode. Results are shown of the platform preliminary design in terms of a design layout with related structural, thermal, mass properties and control dynamics data. The assembly scenario is described. Estimates of the total construction time and Orbiter support requirements are also presented.  相似文献   

20.
Scientists have conducted studies involving human spaceflight crews for over three decades. These studies have progressed from simple observations before and after each flight to sophisticated experiments during flights of several weeks up to several months. The findings from these experiments are available in the scientific literature. Management of these flight experiments has grown into a system fashioned from the Apollo Program style, focusing on budgeting, scheduling and allocation of human and material resources. While these areas remain important to the future, the International Space Station (ISS) requires that the Life Sciences spaceflight experiments expand the existing project management methodology. The use of telescience with state-of-the-art information technology and the multi-national crews and investigators challenges the former management processes. Actually conducting experiments on board the ISS will be an enormous undertaking and International Agreements and Working Groups will be essential in giving guidance to the flight project management Teams forged in this matrix environment must be competent to make decisions and qualified to work with the array of engineers, scientists, and the spaceflight crews. In order to undertake this complex task, data systems not previously used for these purposes must be adapted so that the investigators and the project management personnel can all share in important information as soon as it is available. The utilization of telescience and distributed experiment operations will allow the investigator to remain involved in their experiment as well as to understand the numerous issues faced by other elements of the program. The complexity in formation and management of project teams will be a new kind of challenge for international science programs. Meeting that challenge is essential to assure success of the International Space Station as a laboratory in space.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号