首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Deployment Mechanisms on the Fast Satellite: Magnetometer,Radial Wire,and Axial Booms
Authors:Pankow  David  Besuner  Robert  Wilkes  Robert  Ullrich  Robert
Institution:(1) Samuel Silver Space Sciences Laboratory, University of California at Berkeley, U.S.A;(2) Besuner Consulting Services, Madera, California, U.S.A;(3) Lockheed Martin Space Mission Systems & Services, Houston, Texas, U.S.A
Abstract:The Fast Auroral SnapshoT (FAST) satellite was launched by a Pegasus XL on August 21, 1996. This was the second launch in the NASA SMall EXplorer (SMEX) program. Early in the mission planning the decision was made to have the University of California at Berkeley Space Sciences Laboratory (UCB-SSL) mechanical engineering staff provide all of the spacecraft appendages, in order to meet the short development schedule, and to insure compatibility. This paper describes the design development, testing and on-orbit deployment of these boom systems: the 2 m carbon fiber magnetometer booms, the 58 m tip to tip spin-plane wire booms, and the 7 m dipole axial stiff booms.
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号