首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   60篇
  免费   6篇
  国内免费   1篇
航空   9篇
航天技术   41篇
航天   17篇
  2022年   3篇
  2021年   2篇
  2020年   8篇
  2019年   3篇
  2018年   6篇
  2017年   2篇
  2016年   3篇
  2015年   3篇
  2014年   6篇
  2013年   2篇
  2012年   1篇
  2011年   6篇
  2010年   9篇
  2009年   3篇
  2008年   4篇
  2007年   1篇
  2006年   1篇
  2005年   1篇
  2003年   1篇
  1997年   1篇
  1992年   1篇
排序方式: 共有67条查询结果,搜索用时 31 毫秒
41.
Results of numerical simulations are presented to examine the global gravity field recovery capability of the Japanese lunar exploration project SELENE (SELenological and ENgineering Explorer) which will be launched in 2007. New characteristics of the SELENE lunar gravimetry include 4-way satellite-to-satellite Doppler tracking of main orbiter and differential VLBI tracking of two small free-flier satellites. It is shown that the proposed satellite constellation will provide the first truly global satellite tracking data coverage. The expected results from these data are; (1) drastic reduction in far-side gravity error, (2) estimation of many gravity coefficients by the observation, not by a priori information, and (3) one order of magnitude improvement over existing gravity models for low-degree field.  相似文献   
42.
43.
In this paper, questions on development, implementation, and operation of RadioAstron project Data Processing Center (DPC) are reviewed. The main components of the dedicated DPC are the computer complex with 1 TFlops/s performance, storage with memory capacity of approximately 10 PB, the network infrastructure, and the corresponding communication channels. Performance enhancement methods and resolution of information storage, archiving, and process problems of space VLBI high-speed digital data flows are analyzed. It is shown that successful operation of DPC is mainly provided by optimal organization of computer system structure, storage, and networking transmission. Some of the important key features of RadioAstron project DPC and its comparative differences from the standard VLBI procedures are considered.  相似文献   
44.
As we move into the next era of geodetic VLBI, the scheduling process is one focus for improvement in terms of increased flexibility and the ability to react with changing conditions. A range of simulations were conducted to ascertain the impact of scheduling on geodetic results such as Earth Orientation Parameters (EOPs) and station coordinates. The potential capabilities of new automated scheduling modes were also simulated, using the so-called ‘dynamic scheduling’ technique. The primary aim was to improve efficiency for both cost and time without losing geodetic precision, particularly to maximise the uses of the Australian AuScope VLBI array.We show that short breaks in observation will not significantly degrade the results of a typical 24?h experiment, whereas simply shortening observing time degrades precision exponentially. We also confirm the new automated, dynamic scheduling mode is capable of producing the same standard of result as a traditional schedule, with close to real-time flexibility. Further, it is possible to use the dynamic scheduler to augment the 3 station Australian AuScope array and thereby attain EOPs of the current global precision with only intermittent contribution from 2 additional stations. We thus confirm automated, dynamic scheduling bears great potential for flexibility and automation in line with aims for future continuous VLBI operations.  相似文献   
45.
Baseline lengths and their time-derivatives among 58 geodetic VLBI stations were fitted by using 4439 observing sessions from the International VLBI Service for Geodesy and Astrometry (IVS). First, the velocities of eight stations in Eurasian continent were set as unknown quantities. Then, two standard global solutions from 3523 IVS sessions and 1110 sessions from database code XA, respectively, were applied prior to all-station coordinates and the non-estimated station velocities. Finally, from the relations among the coordinates, velocities, baseline length and its time-derivative, two types of baseline post-adjustment (BPA) were used to estimate the velocities of the eight stations. We discuss the data processing details, including the effect of different prior values for the stations and the optimal solution.  相似文献   
46.
High accuracy differenced phase delay can be obtained by observing multiple point frequencies of two spacecraft using the same beam Very Long Baseline Interferometry (VLBI) technology. Its contribution in lunar spacecraft precision orbit determination has been performed during the Japanese lunar exploration mission SELENE. In consideration that there will be an orbiter and a return capsule flying around the moon during the Chinese lunar exploration future mission Chang’E-3, the contributions of the same beam VLBI in spacecraft precision orbit determination and lunar gravity field solution have been investigated. Our results show that the accuracy of precision orbit determination can be improved more than one order of magnitude after including the same beam VLBI measurements. There are significant improvements in accuracy of low and medium degree coefficients of lunar gravity field model obtained from combination of two way range and Doppler and the same beam VLBI measurements than the one that only uses two way range and Doppler data, and the accuracy of precision orbit determination can reach meter level.  相似文献   
47.
介绍了一套用于深空探测的先进通信与导航体制.在综述美国国家航空航天局相关研究进展、讨论这套体制中的关键特征技术的同时,文章利用飞行在地月平动点L3/L4/L5的晕轨道上的中继通信和跟踪卫星,建议了一种超长距离干涉测量(ELBI)技术.探讨了ELBI技术对先进通信与导航体制进行增强的可能性和应用潜力.  相似文献   
48.
讨论了差分VLBI系统在深空探测中应用的几个问题,就标校接收机的带宽设计进行了分析,提出了目标接收机在应用中可能的三种信号形式,并分析了三种信号形式在深空探测中应用的可能性,验算了每种信号形式的性能,并对将来可能使用形式进行了探讨。  相似文献   
49.
天线组阵能否完全替代大口径天线有一个关键性难题,就是天线阵是否支持上行链路组阵。深空航天器无法将不同地面天线的上行信号对齐,所以上行链路信号的调整必须在地面完成。针对上行组阵发射机相位调整问题,提出一种基于VLBI(Very Long Baseline Interferometry,甚长基线干涉测量)技术的接收模式天线上行组阵标校方案,并对标校精度进行了简要分析。将上行链路时延分解为几何时延和发射系统时延,建立了几何时延模型,通过标定接收时延和发射时延,便可以得到天线阵元间的相位标校值。理论分析结果表明,该方案具有一定的可行性,对上行组阵相位标校的研究具有一定的借鉴意义。  相似文献   
50.
In this paper we present results assessing the role of Very Long Baseline Interferometry (VLBI) tracking data through precision orbit determination (POD) during the check-out phase for Chang’E-1, and the lunar gravity field solution CEGM-01 based on the orbital tracking data acquired during the nominal phase of the mission. The POD of Chang’E-1 is performed using S-band two-way Range and Range Rate (R&RR) data, together with VLBI delay and delay rate observations. The role of the VLBI data in the POD of Chang’E-1 is analyzed, and the resulting orbital accuracies are estimated for different solution strategies. The final orbital accuracies proved that the VLBI tracking data can improve the Chang’E-1 POD significantly. Consequently, CEGM-01 based on six-month tracking data during Chang’E-1 nominal mission phase is presented, and the accuracy of the model is assessed by means of the gravity field power spectrum, admittance and coherence between gravity and topography, lunar surface gravity anomaly and POD for both Chang’E-1 and Lunar Prospector (LP). Our analysis indicates that CEGM-01 has significant improvements over a prior model (i.e. GLGM-2), and shows the potential of Chang’E-1 tracking data in high resolution lunar gravity field model solution by combining with SELENE and LP tracking data.  相似文献   
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号