首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   14篇
  免费   0篇
航空   7篇
航天技术   3篇
航天   4篇
  2021年   1篇
  2014年   1篇
  2011年   2篇
  2010年   1篇
  2006年   1篇
  2005年   1篇
  2001年   1篇
  2000年   2篇
  1985年   1篇
  1978年   3篇
排序方式: 共有14条查询结果,搜索用时 15 毫秒
11.
Highly efficient low-thrust propulsion is increasingly applied beyond commercial use, also in mainstream and flagship science missions, in combination with gravity assist propulsion. Another recent development is the growth of small spacecraft solutions, not in size but in numbers and individual capabilities.Just over ten years ago, the DLR-ESTEC Gossamer Roadmap to Solar Sailing was set up to guide technology developments towards a propellant-less and highly efficient class of spacecraft for solar system exploration and applications missions: small spacecraft solar sails designed for carefree handling and equipped with carried application modules.Soon, in three dedicated Gossamer Roadmap Science Working Groups it initiated studies of missions uniquely feasible with solar sails such as Displaced L1 (DL1) space weather advance warning and monitoring, Solar Polar Orbiter (SPO) delivery to very high inclination heliocentric orbit, and multiple Near-Earth Asteroid (NEA) rendezvous (MNR). Together, they demonstrate the capability of near-term solar sails to achieve at least in the inner solar system almost any kind of heliocentric orbit within 10 years, from the Earth-co-orbital to the extremely inclined, eccentric and even retrograde. Noted as part of the MNR study, sail-propelled head-on retrograde kinetic impactors (RKI) go to this extreme to achieve the highest possible specific kinetic energy for the deflection of hazardous asteroids.At DLR, the experience gained in the development of deployable membrane structures leading up to the successful ground deployment test of a (20 m)2, i.e., 20 m by 20 m square solar sail at DLR Cologne in 1999 was revitalized and directed towards a 3-step small spacecraft development line from as-soon-as-possible sail deployment demonstration (Gossamer-1) via in-flight evaluation of sail attitude control actuators (Gossamer-2) to an envisaged proving-the-principle flight in the Earth-Moon system (Gossamer-3). First, it turned the concept of solar sail deployment on its head by introducing four separable Boom Sail Deployment Units (BSDU) to be discarded after deployment, enabling lightweight 3-axis stabilized sailcraft. By 2015, this effort culminated in the ground-qualified technology of the DLR Gossamer-1 deployment demonstrator Engineering Qualification Model (EQM). For mission types using separable payloads, such as SPO, MNR and RKI, design concepts can be derived from the BSDU characteristic of DLR Gossamer solar sail technology which share elements with the separation systems of asteroid nanolanders like MASCOT. These nano-spacecraft are an ideal match for solar sails in micro-spacecraft format whose launch configurations are compatible with ESPA and ASAP secondary payload platforms.Like any roadmap, this one contained much more than the planned route from departure to destination and the much shorter distance actually travelled. It is full of lanes, narrow and wide, detours and shortcuts, options and decision branches. Some became the path taken on which we previously reported. More were explored along the originally planned path or as new sidings in search of better options when circumstance changed and the project had to take another turn. But none were dead ends, they just faced the inevitable changes when roadmaps face realities and they were no longer part of the road ahead. To us, they were valuable lessons learned or options up our sleeves. But for future sailors they may be on their road ahead.  相似文献   
12.
GRACE, designed to monitor temporal variations in the fluid mass at the surface of the Earth, is still operating and providing invaluable data 7 years after launch. One hundred and ninety-nine satellite-only geopotential solutions to degree and order 50 were recomputed per 10-day interval for the period 29 July 2002–27 May 2008 using an improved data editing and solution regularization procedure. These release 2 solutions are significantly improved compared to release 1 solutions, the noise over deserts and oceans in the form of North–South striping being reduced by 20–40%. This is thanks to the tailored regularization of each individual Stokes coefficient applied in the solution procedure, and to a time-variable reference model containing mean annual, semiannual and secular variations for degrees 2–50 towards which the variations per 10-day solution are constrained. It may attenuate signals of the order of a few percent, whereas this always occurs when applying a Gaussian smoother even with a half-width smoothing radius as small as 300 km. The uncertainty of an individual point in the time series of a basin expressed in equivalent water height inferred from the 10-day solutions is approximately 20 mm. Comparison of these 10-day solutions to monthly GRACE project solutions (CSR, GFZ and JPL) shows substantial differences. Even for the largest basin, the Amazon, a 15% difference in annual amplitude is found between CNES release 2 and CSR versus GFZ and JPL. The mass-loss estimates for East and West Greenland vary by 100%. Sometimes clear outliers are detected in the GFZ and JPL solutions when a particular basin is studied, which have to be eliminated. In view of the large differences detected between the time series for specific basins, it is hazardous to draw conclusions based on a single solution.  相似文献   
13.
The Ulysses spacecraft is reaching high heliolatitudes during the approach to solar maximum. We show preliminary in situ electron observations from the URAP experiment, using thermal noise spectroscopy. This method is especially suited to measure accurately the electron density and thermal temperature. The data acquired in the period June–September 2000 are compared to those obtained at similar heliolatitudes near solar activity minimum and in the ecliptic plane near both solar maximum and minimum. This revised version was published online in August 2006 with corrections to the Cover Date.  相似文献   
14.
This paper is concerned mainly with the information which can be extracted from frequency-time spectra in the VLF range. The instrument used is the correlator which has a good frequency resolution (50 Hz) and time resolution (30 ms) in one magnetic and one electric component simultaneously. By suitable computer analysis, it is possible for instance to distinguish between the two dominant electromagnetic emissions, hiss and chorus, as well as to display the complete spectra. This treatment is applied to the Survey periods, which are a fixed sequence of modes, repeated every hour on the hour in order to have reference data from GEOS analogous to many ground-based observatories. One result of this treatment obtained already is that hiss and chorus normally appear together, although one or the other may be dominating in intensity. The occurrence rate of these emissions in local time is also given.For continuous surveillance the filterbank data are used. There are 16 frequency filters supplying magnetic and electric amplitude at few different frequencies. Using these data, a storm sudden commencement can be followed with good time resolution (1 s), and an interesting correlation has been found in a few cases between the VLF signal amplitude and the cold plasma density (as measured by the active part of the S-300 experiment).  相似文献   
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号