首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 15 毫秒
1.
In order to verify that the International Space Station (ISS) payload facility racks do not disturb the microgravity environment of neighboring facility racks and that the facility science operations are not compromised, a testing and analytical verification process must be followed. Currently no facility racks have taken this process from start to finish. The authors are participants in implementing this process for the NASA Glenn Research Center (GRC) Fluids and Combustion Facility (FCF). To address the testing part of the verification process, the Microgravity Emissions Laboratory (MEL) was developed at GRC. The MEL is a 6 degree of freedom inertial measurement system capable of characterizing inertial response forces (emissions) of components, sub-rack payloads, or rack-level payloads down to 10(-7) g's. The inertial force output data, generated from the steady state or transient operations of the test articles, are utilized in analytical simulations to predict the on-orbit vibratory environment at specific science or rack interface locations. Once the facility payload rack and disturbers are properly modeled an assessment can be made as to whether required microgravity levels are achieved. The modeling is utilized to develop microgravity predictions which lead to the development of microgravity sensitive ISS experiment operations once on-orbit. The on-orbit measurements will be verified by use of the NASA GRC Space Acceleration Measurement System (SAMS). The major topics to be addressed in this paper are: (1) Microgravity Requirements, (2) Microgravity Disturbers, (3) MEL Testing, (4) Disturbance Control, (5) Microgravity Control Process, and (6) On-Orbit Predictions and Verification.  相似文献   

2.
3.
The Microgravity Research Program (MRP) participated aggressively in Phase 1 of the International Space Station Program using the Russian Mir Space Station. The Mir Station offered an otherwise unavailable opportunity to explore the advantages and challenges of long duration microgravity space research. Payloads with both National Aeronautics and Space Agency (NASA) and commercial backing were included as well as cooperative research with the Canadian Space Agency (CSA). From this experience, much was learned about long-duration on-orbit science utilization and developing new working relationships with our Russian partner to promote efficient planning, operations, and integration to solve complexities associated with a multiple partner program.

This paper focuses on the microgravity research conducted onboard the Mir space station. It includes the Program preparation and planning necessary to support this type of cross increment research experience; the payloads which were flown; and summaries of significant microgravity science findings.  相似文献   


4.
In order to fulfil the microgravity requirements for space experiments,improved technology for the microgravity environment is proposed,including that for raising the orbital altitude,optimizing the layout of the disturbance source,using 1 N-thrusters instead of 5 N-thrusters,etc.In addition,evaluation of the microgravity environment of the recoverable satellite was also conducted using on-orbit micro-vibration measurement,on-orbit experiment and data analysis technologies.The microgravity level of the SJ-10 recoverable satellite in China is compared with the spacecraft used for carrying out space science experiments internationally.This paper describes the microgravity environment of the SJ-10 recoverable satellite,and its importance for analysing space experimental results.  相似文献   

5.
The Special Purpose Dextreous Manipulator (Dextre) is the latest addition to the on-orbit segment of the Mobile Servicing System (MSS); Canada's contribution to the International Space Station (ISS). Launched in March 2008, the advanced two-armed robot is designed to perform various ISS maintenance tasks on robotically compatible elements and on-orbit replaceable units using a wide variety of tools and interfaces. The addition of Dextre has increased the capabilities of the MSS, and has introduced significant complexity to ISS robotics operations. While the initial operations concept for Dextre was based on human-in-the-loop control by the on-orbit astronauts, the complexities of robotic maintenance and the associated costs of training and maintaining the operator skills required for Dextre operations demanded a reexamination of the old concepts. A new approach to ISS robotic maintenance was developed in order to utilize the capabilities of Dextre safely and efficiently, while at the same time reducing the costs of on-orbit operations. This paper will describe the development, validation, and on-orbit demonstration of the operations concept for ground-based tele-robotics control of Dextre. It will describe the evolution of the new concepts from the experience gained from the development and implementation of the ground control capability for the Space Station Remote Manipulator System; Canadarm 2. It will discuss the various technical challenges faced during the development effort, such as requirements for high positioning accuracy, force/moment sensing and accommodation, failure tolerance, complex tool operations, and the novel operational tools and techniques developed to overcome them. The paper will also describe the work performed to validate the new concepts on orbit and will discuss the results and lessons learned from the on-orbit checkout and commissioning of Dextre using the newly developed tele-robotics techniques and capabilities.  相似文献   

6.
The NASA Radiation Belt Storm Probes (RBSP) mission, currently in Phase B, is a two-spacecraft, Earth-orbiting mission, which will launch in 2012. The spacecraft's S-band radio frequency (RF) telecommunications subsystem has three primary functions: provide spacecraft command capability, provide spacecraft telemetry and science data return, and provide accurate Doppler data for navigation. The primary communications link to the ground is via the Johns Hopkins University Applied Physics Laboratory's (JHU/APL) 18 m dish, with secondary links to the NASA 13 m Ground Network and the Tracking and Data Relay Spacecraft System (TDRSS) in single-access mode. The on-board RF subsystem features the APL-built coherent transceiver and in-house builds of a solid-state power amplifier and conical bifilar helix broad-beam antennas. The coherent transceiver provides coherency digitally, and controls the downlink data rate and encoding within its field-programmable gate array (FPGA). The transceiver also provides a critical command decoder (CCD) function, which is used to protect against box-level upsets in the C&DH subsystem. Because RBSP is a spin-stabilized mission, the antennas must be symmetric about the spin axis. Two broad-beam antennas point along both ends of the spin axis, providing communication coverage from boresight to 70°. An RF splitter excites both antennas; therefore, the mission is designed such that no communications are required close to 90° from the spin axis due to the interferometer effect from the two antennas. To maximize the total downlink volume from the spacecraft, the CCSDS File Delivery Protocol (CFDP) has been baselined for the RBSP mission. During real-time ground contacts with the APL ground station, downlinked files are checked for errors. Handshaking between flight and ground CFDP software results in requests to retransmit only the file fragments lost due to dropouts. This allows minimization of RF link margins, thereby maximizing data rate and thus data volume.  相似文献   

7.
空间站有效载荷真空支持系统方案评述   总被引:1,自引:0,他引:1  
有效载荷真空支持系统是空间有效载荷支持系统的重要组成部分,为空间有效载荷实验的顺利进行提供真空环境支持和保证。文章详细分析了国际空间站包括美国“命运号”实验舱(USL)、欧空局哥伦布轨道舱(APM)及日本实验舱(JEM)内的有效载荷真空支持系统方案及使用情况;对美国实验舱内的一号微重力材料科学机柜及微重力燃烧科学机柜内部专用的真空支持系统作了主要介绍;最后提出了我国空间站有效载荷真空支持系统的初步方案设想,即合理安排有效载荷实验进行次序,将废气排放子系统及真空资源子系统合二为一,以节约资源,提高可靠性。  相似文献   

8.
基于星上动态指令调度的卫星使用效能提升技术   总被引:1,自引:0,他引:1  
田志新  汤海涛  王中果  汪大宝  曹京 《宇航学报》2014,35(10):1105-1113
针对传统任务管理模式采用静态约束指令序列导致卫星使用效能的不足,提出一种基于有向图模型的动态约束自适应任务管理方案。采用面向用户的星地任务控制接口,利用地面仿真和星上实时遥测获取任务运行过程的动态约束参数,星载计算机据此动态生成任务指令序列。针对某高性能光学卫星的仿真试验表明,与传统任务管理模式相比,卫星操作接口复杂度减少88.5%,任务注入效率提升699%,有效载荷数据传输效率提升10%,全球数据获取能力提升11%,对我国区域的实时数据获取能力提升100%。方案对遥感卫星在轨运行管理具有借鉴意义。  相似文献   

9.
李由  王春慧  严曲  张小虎  谢良 《宇航学报》2019,40(6):725-732
SpaceMocap是一套基于多RGB-D相机的计算机视觉航天员运动捕捉系统。地面准备阶段,扫描航天员模型,并分别标定彩色相机的内参数。在轨采集阶段,3~4台相机布置在舱内角落,同步采集航天员任务视频。地面处理阶段,通过相机外参数标定和ICP方法实现点云融合,采用深度神经网络对人体关节点位置进行检测并初始化位姿参数,再用改进的ICP方法进行位姿求精,实现序列图像中关节角度跟踪。本系统搭载TG-2升空,对SZ-11航天员的任务视频进行了采集和处理,首次获取了在轨航天员的姿态(包括中性体位)、占位空间、运动参数等重要数据。结果表明,运动捕捉的模型与点云具有良好的重合度,关节点位置与关节角度具有较高的跟踪精度。SpaceMocap是我国首个在轨运动捕捉系统,它小型、轻质,具有计算机视觉特有的非接触测量、直观、高精度优势,无需在人体上粘贴任何标志,具有良好的抗遮挡能力,完全适用于微重力、狭小空间环境下的在轨应用 。  相似文献   

10.
基于无源光网络的高速光纤总线技术研究   总被引:1,自引:0,他引:1  
随着航天遥感类载荷性能的提高,其数据量大幅增加,对高速数据传输提出了更高要求.针对航天环境的高可靠性要求,提出了一种基于命令响应式协议的新型高速光纤总线结构,即把无源光网络技术与FC-AE-1553协议相结合,采用高生存性的逆向双环的冗余拓扑结构搭建了地面演示验证系统.实验表明,新的光纤总线系统通信速率可达2.5Gbps,容易隔离失效节点,所用设备简单,可靠性高,满足航天工程应用需求,具有较强的实用价值.  相似文献   

11.
The microgravity measurement assembly (MMA) is a precision measurement facility for ground and on-orbit disturbance accelerations on board Spacelab, being currently under development by MBB/ERNO under DFVLR contract. MMA is using a new generation of micromechanical acceleration detectors developed by CSEM under ESTEC contract. Small dimensions of the triaxial sensor packages allow for installation very close to scientific experiments; mass is significantly reduced compared to conventional systems. Six or more of these mini-sensor packages are installed at the most g-sensitive experiments of Spacelab Module Missions. Acceleration and housekeeping data are processed in real time by a dedicated microcomputer and transmitted to the ground. Thus, for the first time, synchronized and comparable precision acceleration data are available in real time on ground for on-line judgement of the microgravity environment desired for experiment success, offering the possibility, for example of experiment repetition in case of excessive g-disturbances. Furthermore, MMA allows for immediate feedback to the crew concerning the microgravity effects of their dynamic behavior, with the aim of crew training towards lower disturbances. An additional mobile sensor package can be installed at vibration sources, e.g. pumps, centrifuges etc. or any arbitrary location inside the Spacelab Module. An impact hammer can be used together with MMA in order to measure in-flight structural transfer functions. The MMA on-board system and ground station and its planned utilization for the German Spacelab Mission D-2 is described.  相似文献   

12.
This paper describes the International Space Station (ISS) micro-meteoroid orbital debris (MMOD) impact shielding including the requirements for protection as well as technical approaches to meeting the requirements. Current activities in providing MMOD protection for ISS are described, including efforts to augment MMOD protection by adding shields on-orbit. Another activity is to observe MMOD impact damage on ISS elements and returned hardware, and to compare the observed damage with predicted damage using Bumper code risk assessment software. A conclusion of this paper is that ISS will be protected adequately from MMOD impact after completing augmentation of ISS shielding for service module, and after improving MMOD protection for Soyuz and Progress vehicles. Another conclusion is that impact damage observed to the ISS mini-pressurized logistics module matches the distribution of impacts predicted by Bumper code.  相似文献   

13.
随着星载软件的复杂度与体量不断增加,对软件在轨重构并进行更新维护的功能愈发重要。当软件越来越大时,使用低速通道进行重构的方案在时间上难以满足在一个测控弧段内重构软件的需求。同时,大软件使得数据存储空间更为紧缺,无法使用三模冗余等传统方法保证程序数据的可靠安全。因此,本文提出了一种使用高速通道的可靠的大体量星载软件重构方案。以固化在PROM(可编程只读存储器)上的引导监控程序作为根本保障,构建一个存于MRAM(磁随机存储器)上专门用于高速重构软件的安全模式程序作为方案核心,并给星载软件加入自重构功能作为最常用的重构方式。通过地面测试与在轨实验表明:该方案能够保证大体量软件重构功能的高速度与高可靠性,让星载软件的更新与维护更加安全与便捷。  相似文献   

14.
Roe LB  Uri JJ 《Acta Astronautica》2003,53(4-10):665-680
The first research payloads reached the International Space Station (ISS) more than two years ago, with research operating continuously since March 2001. Seven research racks are currently on-orbit, with three more arriving soon to expand science capabilities. Through the first five expeditions, 60 unique NASA-managed investigations from 11 nations have been supported, many continuing into later missions. More than 90,000 experiment hours have been completed, and more than 1,000 hours of crew time have been dedicated to research, numbers that grow daily. The multidisciplinary program includes research in life sciences, physical sciences, biotechnology, Earth sciences, technology demonstrations as well as commercial endeavors and educational activities. The Payload Operations and Integration Center monitors the onboard activities around the clock, working with numerous Principal Investigators and Payload Developers at their remote sites. Future years will see expansion of the station with research modules provided by the European Space Agency and Japan, which will be outfitted with additional research racks.  相似文献   

15.
The International Space Station (ISS) is no longer a paper program, focused on design, development and planning. It is an operational program, with hardware soon to be launched and ground systems in place. Additional modules, components and elements are now under construction in almost all of the 16 ISS International Partner and Participant countries, with metal being bent, software being written, and testing ongoing. Crew members for the first four crews are in training in the U.S. and Russia, with the first crew launching in mid 1999. Mission control centers are fully functioning in Houston and Moscow, with operations centers in St. Hubert, Darmstadt, Tsukuba, Turino, and Huntsville going on line as they are required.

The International Space Station, as the largest international civil program in history, features unprecedented technical, managerial, and international complexity. Seven international partners and participants encompassing 15 countries are involved in the ISS. Each partner is contributing and will be operating separate pieces of hardware, to be integrated on-orbit into a single orbital station. Mission control centers, launch vehicles, astronauts/cosmonauts, and support services will be provided by partners across the globe, but must function in a coordinated, integrated fashion. This paper will review the accomplishments of the ISS Program and each of the Partners and Participants over the past year, focusing on completed milestones and hardware. It will also give a status report on the development of the remainder of the ISS modules and components by each Partner and Participant, and discuss upcoming challenges.  相似文献   


16.
FY-4 is the second generation of Chinese geostationary satellite for quantitative remote sensing meteorological application. The detection efficiency, spectral bands, spatial and time resolution have been greatly improved with respect to those of first generation, as well as the radiometric calibration and sensitivity. The combination of multichannel detection and vertical sounding was first realized on FY-4, because both the Advanced Geostationary Radiation Imager(AGRI) and Geostationary Interferometric Infrared Sounder(GIIRS) are on the same spacecraft. The main performance of the payloads including AGRI, GIIRS and Lightning Mapping Imager, and the spacecraft bus are presented, the performance being equivalent to the level of the third generation meteorological satellites in Europe and USA. The acquiring methods of remote sensing data including multichannel and high precision quantitative observing, imaging collection of the ground and cloud, vertical observation of atmospheric temperature and moisture, lightning imaging observation and space environment detection are shown. Several innovative technologies including high accuracy rotation angle detection and scanning control, high precision calibration, micro vibration suppression, unified reference of platform and payload and on-orbit measurement, real-time image navigation and registration on-orbit were applied in FY-4.  相似文献   

17.
To meet the significant increase in EVA demand to support assembly and operations of the International Space Station (ISS), NASA and industry have improved the current Shuttle Extravehicular Mobility Unit (EMU), or "space suit", configuration to meet the unique and specific requirements of an orbital-based system. The current Shuttle EMU was designed to be maintained and serviced on the ground between frequent Shuttle flights. ISS will require the EMUs to meet increased EVAs out of the Shuttle Orbiter and to remain on orbit for up to 180 days without need for regular return to Earth for scheduled maintenance or refurbishment. Ongoing Shuttle EMU improvements have increased reliability, operational life and performance while minimizing ground and on-orbit maintenance cost and expendable inventory. Modifications to both the anthropomorphic mobility elements of the Space Suit Assembly (SSA) as well as to the Primary Life Support System (PLSS) are identified and discussed. This paper also addresses the status of on-going Shuttle EMU improvements and summarizes the approach for increasing interoperability of the U.S. and Russian space suits to be utilized aboard the ISS.  相似文献   

18.
The European Space Agency (ESA) contribution to the International Space Station (ISS) goes much beyond the delivery of hardware like the Columbus Laboratory, its payloads and the Automated Transfer Vehicles. ESA Astronauts will be members of the ISS crew. ESA, according to its commitments as ISS international partner, will be responsible to provide training on its elements and payloads to all ISS crewmembers and medical support for ESA astronauts. The European Astronaut Centre (EAC) in Cologne has developed over more than a decade into the centre of expertise for manned space activities within ESA by contributing to a number of important co-operative spaceflight missions. This role will be significantly extended for ISS manned operations. Apart from its support to ESA astronauts and their onboard operations, EAC will have a key role in training all ISS astronauts on ESA elements and payloads. The medical support of ISS crew, in particular of ESA astronauts has already started. This paper provides an overview on status and further plans in building up this homebase function for ESA astronauts and on the preparation towards Training Readiness for ISS crew training at EAC, Cologne. Copyright 2001 by the European Space Agency. Published by the American Institute of Aeronautics and Astronautics, Inc., with permission. Released to IAF/IAA/AIAA to publish in all forms.  相似文献   

19.
作为卫星在轨对地探测的有效载荷,星载辐射计在轨扫描转动时的动平衡特性直接影响卫星在轨探测精度和姿态稳定度。文章介绍星载辐射计动平衡技术研究现状和发展趋势,并基于现有地面动平衡技术的局限和型号发展需求提出在轨动平衡技术的初步设想,阐述了在轨动平衡配平技术、测量技术和实时调整反馈控制技术,可为今后类似旋转式星载辐射计的动平衡设计和动平衡控制方法提供参考依据。  相似文献   

20.
Canada and the International Space Station program: overview and status   总被引:4,自引:0,他引:4  
Gibbs G  Sachdev S 《Acta Astronautica》2002,51(1-9):591-600
The twelve months since IAF 2000 have been perhaps the most exciting, challenging and rewarding months for Canada since the beginning of our participation in the International Space Station program in 1984. The highlight was the successful launch, on-orbit check out, and the first operational use of Canadarm2, the Space Station Remote Manipulator System, between April and July 2001. The anomalies encountered and the solutions found to achieve this success are described in the paper. The paper describes, also, the substantial progress that has been made, during the twelve months since IAF 2000, by Canada as it continues to complete work on all flight-elements of its contribution to the International Space Station and as we transition into real-time Space Station operations support and Canadian utilization. Canada's contribution to the International Space Station is the Mobile Servicing System (MSS), the external robotic system that is key to the successful assembly of the Space Station, the maintenance of its external systems, astronaut EVA support, and the servicing of external science payloads. The MSS ground segment that supports MSS operations, training, sustaining engineering, and logistics activities is reaching maturity. The MSS Engineering Support Center and the MSS Sustaining Engineering Facility are providing real-time support for on-orbit operations, and a Canadian Payloads Telescience Operations Center is now in place. Mission Controllers, astronauts and cosmonauts from all Space Station Partners continue to receive training at the Canadian Space Agency. The Remote Multi Purpose Room, one element of the MSS Operations Complex, will be ready to assume backroom support in 2002. Canada has completed work on identifying its Space Station utilization activities for the period 2000 through 2004. Also during the past twelve months the CSA drafted and is proceeding with the approval of a Canadian Space Station Commercialization Policy. Canadian astronauts have now participated in three ISS assembly missions--Julie Payette on STS-96, Marc Garneau on STS-97, and Chris Hadfield on STS-100 in April 2001 during which he performed Canada's first EVA and the successful installation of the Space Station Remote Manipulator System.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号