首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Comprehensive outage compensation of real-time orbit and clock corrections with broadcast ephemeris for ambiguity-fixed precise point positioning
Authors:Qing Zhao  Wang Gao  Chengfa Gao  Shuguo Pan  Xing Yang  Jun Wang
Institution:1. School of Transportation, Southeast University, Nanjing 210096, China;2. School of Instrument Science and Engineering, Southeast University, Nanjing 210096, China;3. Key Laboratory of Micro-Inertial Instrument and Advanced Navigation Technology, Ministry of Education, Nanjing 210096, China;4. Jiangsu Hydraulic Research Institute, Nanjing, Jiangsu 210017, China
Abstract:The main challenge in real-time precise point positioning (PPP) is that the data outages or large time lags in receiving precise orbit and clock corrections greatly degrade the continuity and real-time performance of PPP positioning. To solve this problem, instead of directly predicting orbit and clock corrections in previous researches, this paper presents an alternative approach of generating combined corrections including orbit error, satellite clock and receiver-related error with broadcast ephemeris. Using ambiguities and satellite fractional-cycle biases (FCBs) of previous epoch and the short-term predicted tropospheric delay through linear extrapolation model (LEM), combined corrections at current epoch are retrieved and weighted with multiple reference stations, and further broadcast to user for continuous enhanced positioning during outages of orbit and clock corrections. To validate the proposed method, two reference station network with different inter-station distance from National Geodetic Survey (NGS) network are used for experiments with six different time lags (i.e., 5 s, 10 s, 15 s, 30 s, 45 s and 60 s), and one set of data collected by unmanned aerial vehicle (UAV) is also used. The performance of LEM is investigated, and the troposphere prediction accuracy of low elevation (e.g., 10–20degrees) satellites has been improved by 44.1% to 79.0%. The average accuracy of combined corrections before and after LEM is used is improved by 12.5% to 77.3%. Without LEM, an accuracy of 2–3 cm can be maintained only in case of small time lags, while the accuracies with LEM are all better than 2 cm in case of different time lags. The performance of simulated kinematic PPP at user end is assessed in terms of positioning accuracy and epoch fix rate. In case of different time lags, after LEM is used, the average accuracy in horizontal direction is better than 3 cm, and the accuracy in up direction is better than 5 cm. At the same time, the epoch fix rate has also increased to varying degrees. The results of the UAV data show that in real kinematic environment, the proposed method can still maintain a positioning accuracy of several centimeters in case of 20 s time lag.
Keywords:Precise point positioning (PPP)  Combined correction  Outage compensation  Broadcast ephemeris  Ambiguity resolution (AR)  Linear extrapolation model (LEM)
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号