Reduction rules-based search algorithm for opportunistic replacement strategy of multiple life-limited parts |
| |
Authors: | Xuyun FU Shisheng ZHONG |
| |
Institution: | Department of Mechanical Engineering, Harbin Institute of Technology at Weihai, Weihai 264209, China |
| |
Abstract: | The opportunistic replacement of multiple Life-Limited Parts(LLPs) is a problem widely existing in industry.The replacement strategy of LLPs has a great impact on the total maintenance cost to a lot of equipment.This article focuses on finding a quick and effective algorithm for this problem.To improve the algorithm efficiency, six reduction rules are suggested from the perspectives of solution feasibility, determination of the replacement of LLPs, determination of the maintenance occasion and solution optimality.Based on these six reduction rules, a search algorithm is proposed.This search algorithm can identify one or several optimal solutions.A numerical experiment shows that these six reduction rules are effective, and the time consumed by the algorithm is less than 38 s if the total life of equipment is shorter than 55000 and the number of LLPs is less than11.A specific case shows that the algorithm can obtain optimal solutions which are much better than the result of the traditional method in 10 s, and it can provide support for determining tobe-replaced LLPs when determining the maintenance workscope of an aircraft engine.Therefore,the algorithm is applicable to engineering applications concerning opportunistic replacement of multiple LLPs in aircraft engines. |
| |
Keywords: | Aircraft engine Maintenance occasion Opportunistic replacement Reduction rules Replacement of life-limited parts |
本文献已被 CNKI ScienceDirect 等数据库收录! |
|