首页 | 本学科首页   官方微博 | 高级检索  
     

大跨度斜拉桥综合评估系统的研制与开发
引用本文:任远,黄侨,林阳子. 大跨度斜拉桥综合评估系统的研制与开发[J]. 南京航空航天大学学报, 2007, 39(4): 535-539
作者姓名:任远  黄侨  林阳子
作者单位:哈尔滨工业大学桥梁工程研究所,哈尔滨,150090;哈尔滨工业大学桥梁工程研究所,哈尔滨,150090;东南大学交通学院,南京,210096
基金项目:高等学校博士学科点专项科研项目 , 黑龙江省交通厅重点科技基金
摘    要:将不确定型层次分析法、模糊理论、集值统计原理等方法应用于大跨度斜拉桥的综合评估中,建立了斜拉桥综合评估的指标体系和评估模型,并通过哈尔滨松花江斜拉桥综合评估的实例,证明了该评估体系的可行性与实用性。在此基础上,采用VC 语言,引入面向对象技术,开发了大跨度斜拉桥综合评估系统,实现了大跨度斜拉桥综合评估的自动化和可视化,可为桥梁的养护管理提供科学依据。

关 键 词:斜拉桥  综合评估  不确定型层次分析  模糊理论  集值统计原理
文章编号:1005-2615(2007)04-0535-05
修稿时间:2006-10-26

Study and Development of Comprehensive Assessment System of Long Span Cable-Stayed Bridges
Ren Yuan,Huang Qiao,Lin Yangzi. Study and Development of Comprehensive Assessment System of Long Span Cable-Stayed Bridges[J]. Journal of Nanjing University of Aeronautics & Astronautics, 2007, 39(4): 535-539
Authors:Ren Yuan  Huang Qiao  Lin Yangzi
Affiliation:1. Institute of Bridge Engineering, Harbin Institute of Technology, Harbin, 150090, China; 2. School of Transportation, Southeast University, Nanjing, 210096, China
Abstract:The uncertain type of analytic hierarchy process(AHP) method,fuzzy theory and set-valued statistics theory are applied to the comprehensive assessment of long span cable-stayed bridges,and then an index system and an assessment model are proposed for comprehensive assessment of cable-stayed bridges.The assessment system is proved to be feasible and practical according to the practical application of the comprehensive assessment of Harbin Songhua River cable-stayed Bridge.By applying object-oriented programming(OOP),a system with VC language is developed for comprehensive assessment of long span cable-stayed bridges,thus realizing automation and visualization.It provides a scientific basis for the maintenance and management of the bridges.
Keywords:cable-stayed bridge  comprehensive assessment  uncertain type of analytic hierarchy process  fuzzy theory  set-valued statistics
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号