排序方式: 共有1条查询结果,搜索用时 0 毫秒
1
1.
The establishment of a B-1 test bed is chronicled from identification of the requirement to the initial measurements program. Disassembly, modification, and reassembly of the airframe are covered. Future modifications and measurements are previewed. The facilities at which the B-1 test bed is located are briefly discussed 相似文献
1