首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   2篇
  免费   0篇
航空   2篇
  2000年   1篇
  1998年   1篇
排序方式: 共有2条查询结果,搜索用时 0 毫秒
1
1.
Automatic Test Equipment (ATE) is becoming increasingly more sophisticated and complex, with an even greater dependency on software. With the onset of Versa Modular Eurocard (VME) Extensions for Instrumentation (VXI) technology into ATE, which is supposed to bring about the promise of interchangeable instrument components. ATE customers are forced to contend with system integration and software issues. One way the ATE customer can combat these problems is to have a separate Independent Verification and Validation (IV&V) organization employ rigorous methodologies to evaluate the correctness and quality of the ATE product throughout its life cycle. IV&V is a systems engineering process where verification determines if the ATE meets its specifications, and validation determines if the ATE performs to the customer's expectations. IV&V has the highest potential payoff of assuring a safe and reliable system if it is initiated at the beginning of the acquisition life cycle and continued throughout the acceptance of the system. It is illustrated that IV&V effects are more pronounced when IV&V activities begin early in the software development life cycle, but later application of IV&V is still deemed to have a significant impact. IV&V is an effective technique to reducing costs, schedule, and performance risks on the development of complex ATE, and a “tool” to efficiently and effectively manage ATE development risks. The IV&V organization has the ability to perform a focused and systematic technical evaluation of hardware and software processes and products. When performed in parallel with the ATE development life cycle, IV&V provides for early detection  相似文献   
2.
Risk is the possibility of suffering loss. In a development project, the loss describes the impact to the project which could be in the form of diminished quality of the end-product, increased costs, delayed completion, or failure. This paper discusses the methods and techniques for identifying and managing the risks involved with Automatic Test Systems development  相似文献   
1
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号