排序方式: 共有4条查询结果,搜索用时 15 毫秒
1
1.
Takashi Iida Kenichi Okamoto Yoshiaki Ohkami Seishiro Kibe Hajime Koshishi Masao Naka Hiromichi Yamamoto 《Acta Astronautica》1985,12(5):335-344
The large assembly antenna in space can meet future requirements of both high frequency and large aperture. This paper proposes an experiment on assembling a large antenna at the Space Station, and discusses a realizable procedure of the experiment. The objective of this experiment is that a large antenna of a 10-m diameter is assembled in space and at the same time problems occurring in the assembling process are clarified by conducting the following experiments: assembly of test articles by manipulators, measurement of both mechanical and electrical performance of the assembled antenna, test of the pointing control system, and operational test. In the operational test, the weather radar development test and the large aperture microwave radiometer development test are conducted. Furthermore, the problem areas and items of further study are discussed in this paper. 相似文献
2.
Akira Tsuchida Kichiro Imagawa Tetsuro Yokoyama Junichi Sakai Mayumi Matsuura Yoshio Toukaku Masao Nakai Tsuyoshi Ito Takayoshi Nishikawa Miki Hirai Yosuke Kaneko Junichi Yamaguchi 《Acta Astronautica》2011,68(7-8):1318-1324
Japan Aerospace Exploration Agency (JAXA) launched its own first manned experiment facility in space called the KIBO (Japanese Experiment Module, JEM) in 2008 and 2009 and started operations as part of International Space Station (ISS). To accomplish this Operation, JAXA made its own ground facility in Tsukuba, Japan, called Space Station Integration and Promotion Center (SSIPC). Ground personnel at SSIPC called the JEM Flight Control Team (JFCT) operate the KIBO and have learnt many lessons during its operation. In this presentation, some topics are chosen and explained such as (1) crew/ground personnel interaction and (2) planning lessons learned for manned space activities. 相似文献
3.
4.
This paper introduces five useful coordinate systems to optimize the apogee motor firing of a geostationary satellite. This optimization minimizes the propellant consumption for station acquisition manoeuvres. The coordinate systems used for this purpose must depict the optimization parameters together with the propellant consumption. In order to get the propellant consumption, some relations between parameters are derived and the equipropellant lines (planes) are drawn in the coordinate systems. These coordinate systems are used not only for the optimization of the apogee motor firing but also for the optimization of the station acquisition strategy, the transfer orbit setting and the apogee motor sizing. 相似文献
1