首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 78 毫秒
1.
Integer ambiguity resolution at a single station can be achieved by introducing predetermined uncalibrated phase delays (UPDs) into the float ambiguity estimates of precise point positioning (PPP). This integer resolution technique has the potential of leading to a PPP-RTK (real-time kinematic) model where PPP provides rapid convergence to a reliable centimeter-level positioning accuracy based on an RTK reference network. Nonetheless, implementing this model is technically subject to how rapidly we can fix wide-lane ambiguities, stabilize narrow-lane UPD estimates, and achieve the first ambiguity-fixed solution. To investigate these issues, we used 7 days of 1-Hz sampling GPS data at 91 stations across Europe. We find that at least 10 min of observations are required for most receiver types to reliably fix about 90% of wide-lane ambiguities corresponding to high elevations, and over 20 min to fix about 90% of those corresponding to low elevations. Moreover, several tens of minutes are usually required for a regional network before a narrow-lane UPD estimate stabilizes to an accuracy of far better than 0.1 cycles. Finally, for hourly data, ambiguity resolution can significantly improve the accuracy of epoch-wise position estimates from 13.7, 7.1 and 11.4 cm to 0.8, 0.9 and 2.5 cm for the East, North and Up components, respectively, but a few tens of minutes is required to achieve the first ambiguity-fixed solution. Therefore, from the timeliness aspect, our PPP-RTK model currently cannot satisfy the critical requirement of instantaneous precise positioning where ambiguity-fixed solutions have to be achieved within at most a few seconds. However, this model can still be potentially applied to some near-real-time remote sensing applications, such as the GPS meteorology.  相似文献   

2.
Precise point positioning (PPP) usually takes about 30?min to obtain centimetre-level accuracy, which greatly limits its application. To address the drawbacks of convergence speed and positioning accuracy, we develop a PPP model with integrated GPS and BDS observations. Based on the method, stations with global coverage are selected to estimate the fractional cycle bias (FCB) of GPS and BDS. The short-term and long-term time series of wide-lane (WL) FCB, and the single day change of narrow-lane (NL) FCB are analysed. It is found that the range of GPS and BDS non-GEO (IGSO and MEO) WL FCB is stable at up to a 30-day-time frame. At times frame of up to 60?days, the stability is reduced a lot. Whether for short-term or long-term, the changes in the BDS GEO WL FCB are large. Moreover, BDS FCB sometimes undergoes a sudden jump. Besides, 17 and 10 stations were used respectively to investigate the convergence speed and positioning errors with six strategies: BDS ambiguity-float PPP (Bfloat), GPS ambiguity-float PPP (Gfloat), BDS/GPS ambiguity-float PPP (BGfloat), BDS ambiguity-fixed PPP (Bfix), GPS ambiguity-fixed (Gfix), and BDS/GPS ambiguity-fixed (BGfix). The average convergence speed of the ambiguity-fixed solution is greatly improved compared with the ambiguity-float solution. In terms of the average convergence time, the Bfloat is the longest and the BGfix is the shortest among these six strategies. Whether for ambiguity-float PPP or ambiguity-fixed PPP, the convergence reduction time in three directions for the combined system is the largest compared with the single BDS. The average RMS value of the Bfix in three directions (easting (E), northing (N), and up (U)) are 2.0?cm, 1.5?cm, and 5.9?cm respectively, while those of the Gfix are 0.8?cm, 0.5?cm, and 1.7?cm. Compared with single system, the BDS/GPS combined ambiguity-fixed system (BGfix) has the fastest convergence speed and the highest accuracy, with average RMS as 0.7?cm, 0.5?cm, and 1.9?cm for the E, N, U components, respectively.  相似文献   

3.
Obtaining reliable GNSS uncalibrated phase delay (UPD) or integer clock products is the key to achieving ambiguity-fixed solutions for real-time (RT) precise point positioning (PPP) users. However, due to the influence of RT orbit errors, the quality of UPD/integer clock products estimated with a globally distributed GNSS network is difficult to ensure, thereby affecting the ambiguity resolution (AR) performance of RT-PPP. In this contribution, by fully utilising the consistency of orbital errors in regional GNSS network coverage areas, a method is proposed for estimating regional integer clock products to compensate for RT orbit errors. Based on Centre National d’Études Spatiales (CNES) RT precise products, the regional GPS/BDS integer clock was estimated with a CORS network in the west of China. Results showed that the difference between the estimated regional and CNES global integer clock/bias products was generally less than 5 cm for GPS, whereas clock differences of greater than 10 cm were observed for BDS due to the large RT orbit error. Compared with PPP using global integer clock/bias products, the AR performance of PPP using the regional integer clock was obviously improved for four rover stations. For single GPS, the horizontal and vertical accuracies of ambiguity-fixed PPP solutions were improved by 56.2% and 45.3% on average, respectively, whereas improvements of 67.5% and 50.5% in the horizontal and vertical directions, respectively, were observed for the combined GPS/BDS situation. Based on a regional integer clock, the RMS error of a kinematic ambiguity-fixed PPP solution in the horizontal direction could reach 0.5 cm. In terms of initialisation time, the average time to first fix (TTFF) in combined GPS/BDS PPP was shortened from 18.2 min to 12.7 min. In view of the high AR performance realised with the use of regional integer clocks, this method can be applied to scenarios that require high positioning accuracy, such as deformation monitoring.  相似文献   

4.
Intra-system biases (ISBs) between BDS-2 and BDS-3 are of critical importance when combining observations from the BDS-2 and BDS-3 systems, which is meaningful to fully take advantage of the BDS positioning capability. Meanwhile, ISBs should also be considered in the estimation of BDS uncalibrated phase delays (UPDs). In this research, we present a BDS-2/BDS-3 joint-processing scheme, as well as a method for estimating BDS UPDs. The characteristics of ISBs and the quality of BDS UPDs are analyzed based on 30-day data from 130 multi-GNSS experimental (MGEX) stations. Our results indicate that the ISBs are related to the type and version of the receiver. The ISBs can be regarded as constant across the course of a given day, and the mean standard deviation (STD) values of ISBs over one month for different types of receivers are generally within 0.2 m. Moreover, to assess the quality of UPD products, the residuals of the estimated UPDs and the utilization rates of the observation data are computed. The results show that the quality of BDS UPDs can be improved by correcting the satellite-induced pseudo-range variations, and by estimating the wide-lane (WL) UPD difference between BDS-2 and BDS-3. The average RMS values of the estimated residuals of WL UPD and narrow-lane (NL) UPD are 0.07 and 0.09 cycles, respectively; moreover, the utilization rate of the observation data of WL UPD and NL UPD can reach above 90 %. The performance of BDS precise point positioning (PPP) and PPP ambiguity resolution (PPP-AR) is analyzed in terms of positioning accuracy and convergence performance in both the static and kinematic modes. Compared with PPP ambiguity-float solutions, the positioning accuracy of PPP-AR is significantly improved, especially in the east direction. The impact of ISBs on PPP and PPP-AR is also analyzed, and the results indicate that ISBs can improve the convergence speed of float PPP, but can be disregarded in PPP-AR.  相似文献   

5.
For precise position services, the real-time precise point positioning (PPP) is a promising technology. The real-time PPP performance is expected to be improved by multi-system combination. The performance of real-time multi-system PPP needs to be periodically investigated, with the increasing number of available satellites and the continuously improved quality of real-time precise products of satellite clocks and orbits. In this study, a comprehensive performance assessment is conducted for the four-system integrated real-time PPP (FSIRT-PPP) with GPS, BDS, Galileo and GLONASS in both static and kinematic modes. The datasets from 118 stations spanning approximately a month are used for analysis, and the real-time stream CLK93 is employed. The superior performance of FSIRT-PPP is validated by comparing with the results of GPS/BDS, GPS/Galileo, GPS/GLONASS, GPS-only, BDS-only, Galileo-only and GLONASS-only cases. The FSIRT-PPP using ionospheric-free (IF) combined observables can achieve a convergence time of 10.9, 4.8 and 11.8 min and a positioning accuracy of 0.4, 0.5 and 0.7 cm in the static mode in the east, north and up directions, respectively, while the derived statistic is 15.4, 7.0 and 16.4 min, and 1.6, 1.2 and 3.4 cm in the kinematic mode in the three directions, respectively. Moreover, we also compare the position solutions of real-time PPP adopting IF combined and uncombined (UC) observables, and prove the mathematical equivalence between the two PPP models in the converged stage, provided that there are no external ionospheric corrections or constraints given to the estimated ionospheric delays in the UC model. The difference between the fully converged positioning accuracy of IF-based and UC-based real-time PPP is marginal, but the UC-based real-time PPP has longer convergence time due to the influence of the significant unmodeled time-varying errors in the real-time precise products as well as the different parameterization between them. For completeness, the real-time kinematic PPP results in harsh environments and the post-processed PPP results are also presented.  相似文献   

6.
Precise satellite orbit and clocks are essential for providing high accuracy real-time PPP (Precise Point Positioning) service. However, by treating the predicted orbits as fixed, the orbital errors may be partially assimilated by the estimated satellite clock and hence impact the positioning solutions. This paper presents the impact analysis of errors in radial and tangential orbital components on the estimation of satellite clocks and PPP through theoretical study and experimental evaluation. The relationship between the compensation of the orbital errors by the satellite clocks and the satellite-station geometry is discussed in details. Based on the satellite clocks estimated with regional station networks of different sizes (∼100, ∼300, ∼500 and ∼700 km in radius), results indicated that the orbital errors compensated by the satellite clock estimates reduce as the size of the network increases. An interesting regional PPP mode based on the broadcast ephemeris and the corresponding estimated satellite clocks is proposed and evaluated through the numerical study. The impact of orbital errors in the broadcast ephemeris has shown to be negligible for PPP users in a regional network of a radius of ∼300 km, with positioning RMS of about 1.4, 1.4 and 3.7 cm for east, north and up component in the post-mission kinematic mode, comparable with 1.3, 1.3 and 3.6 cm using the precise orbits and the corresponding estimated clocks. Compared with the DGPS and RTK positioning, only the estimated satellite clocks are needed to be disseminated to PPP users for this approach. It can significantly alleviate the communication burdens and therefore can be beneficial to the real time applications.  相似文献   

7.
The primary system of Chinese global BeiDou satellite system (BDS-3) was completed to provide global services on December 27, 2018; this was a key milestone in the development process for BDS in terms of its provision of global services. Therefore, this study analyzed the current performance of BDS-3, including its precise positioning, velocity estimation, and time transfer (PVT). The datasets were derived from international GNSS monitoring and assessment system (iGMAS) tracking networks and the two international time laboratories in collaboration with the International Bureau of Weights and Measures (BIPM). With respect to the positioning, the focus is on the real-time kinematic (RTK) positioning and precise point positioning (PPP) modes with static and kinematic scenarios. The results show that the mean available satellite number is 4.8 for current BDS-3 system at short baseline XIA1–XIA3. The RTK accuracy for three components is generally within cm level; the 3D mean accuracy is 8.9 mm for BDS-3 solutions. For the PPP scenarios, the convergence time is about 4 h for TP01 and BRCH stations in two scenarios. After the convergence, the horizontal positioning accuracy is better than cm level and the vertical accuracy nearly reaches the 1 dm level. With respect to kinematic scenarios, the accuracy stays at the cm level for horizontal components and dm level for the vertical component at two stations. In terms of velocity estimation, the horizontal accuracy stays at a sub-mm level, and the vertical accuracy is better than 2 mm/s in the BDS-3 scenario, even in the Arctic. In terms of time and frequency transfer, the noise level of BDS-3 time links can reach 0.096 ns for long-distances link NT01–TP02 and 0.016 ns for short-distance links TP01–TP02. Frequency stability reaches 5E–14 accuracy when the averaging time is within 10,000 s for NT01–TP02 and 1E–15 for TP01–TP02.  相似文献   

8.
在GPS 单点定位中, 参数解算的收敛时间和收敛稳定性是重要的研究内容之一, 影响收敛时间和收敛稳定性的因素很多, 本文主要就观测资料的不同采样间隔、卫星钟差资料的不同采样间隔、不同的定位精度要求对精密单点定位中参数收敛时间的影响进行了深入的分析探讨, 以中国上海GPS综合应用网中的12个测站资料为例, 分析了采样间隔、定位精度要求与收敛时间的关系, 并对不同采样间隔的收敛时间进行了统计分析, 得出一些初步结论.   相似文献   

9.
Motivated by the IGS real-time Pilot Project, GFZ has been developing its own real-time precise positioning service for various applications. An operational system at GFZ is now broadcasting real-time orbits, clocks, global ionospheric model, uncalibrated phase delays and regional atmospheric corrections for standard PPP, PPP with ambiguity fixing, single-frequency PPP and regional augmented PPP. To avoid developing various algorithms for different applications, we proposed a uniform algorithm and implemented it into our real-time software. In the new processing scheme, we employed un-differenced raw observations with atmospheric delays as parameters, which are properly constrained by real-time derived global ionospheric model or regional atmospheric corrections and by the empirical characteristics of the atmospheric delay variation in time and space. The positioning performance in terms of convergence time and ambiguity fixing depends mainly on the quality of the received atmospheric information and the spatial and temporal constraints. The un-differenced raw observation model can not only integrate PPP and NRTK into a seamless positioning service, but also syncretize these two techniques into a unique model and algorithm. Furthermore, it is suitable for both dual-frequency and sing-frequency receivers. Based on the real-time data streams from IGS, EUREF and SAPOS reference networks, we can provide services of global precise point positioning (PPP) with 5–10 cm accuracy, PPP with ambiguity-fixing of 2–5 cm accuracy, PPP using single-frequency receiver with accuracy of better than 50 cm and PPP with regional augmentation for instantaneous ambiguity resolution of 1–3 cm accuracy. We adapted the system for current COMPASS to provide PPP service. COMPASS observations from a regional network of nine stations are used for precise orbit determination and clock estimation in simulated real-time mode, the orbit and clock products are applied for real-time precise point positioning. The simulated real-time PPP service confirms that real-time positioning services of accuracy at dm-level and even cm-level is achievable with COMPASS only.  相似文献   

10.
The Crustal Movement Observation Network of China (CMONOC) is one of the major scientific infrastructures, mainly using Global Positioning System (GPS) measurements, to monitor crustal deformation in the Chinese mainland. In this paper, decade-long coordinate time series of 26 continuous GPS sites of CMONOC are analyzed for their noise content using maximum likelihood estimation (MLE). We study the noise properties of continuous GPS time series of CMONOC for the unfiltered, filtered solutions and also the common mode signals in terms of power law plus white noise model. In the spatial filtering, we remove for every time series a common mode error that was estimated from a modified stacking of position residuals from other sites within ∼1000 km of the selected site. We find that the common mode signal in our network has a combination of spatially correlated flicker noise and a common white noise with large spatial extent. We demonstrate that for the unfiltered solutions of CMONOC continuous GPS sites the main colored noise is a flicker process, with a mean spectral index of ∼1. For the filtered solutions, the main colored noise is a general power law process, indicating that a major number of the filtered regional solutions have a combination of noise sources or local effects. The velocity uncertainties from CMONOC continuous GPS coordinate time series may be underestimated by factors of 8–16 if a pure white noise model is assumed. In addition, using a white plus flicker noise model, the median values of velocity errors for the unfiltered solutions are 0.16 (north), 0.17 (east) and 0.58 (vertical) mm/yr, and the median values for the filtered solutions are 0.09 (north), 0.10 (east) and 0.40 (vertical) mm/yr.  相似文献   

11.
We performed an initial analysis of the pseudorange data of the GIOVE-B satellite, one of the two experimental Galileo satellites currently in operation, for time transfer.1 For this specific aim, software was developed to process the GIOVE-B raw pseudoranges and broadcast navigation messages collected by the Galileo Experimental Sensor Stations (GESS) tracking network, yielding station clock phase errors with respect to the Experimental Galileo System Time (EGST). The software also allows processing the Global Positioning System (GPS) P1 and P2 pseudorange data with broadcast navigation message collected at the same stations to obtain the station clock phase errors with respect to the GPS system time (GPST). Differencing these solutions between stations provides two independent means of GNSS time transfer. We compared these time transfer results with Precise Point Positioning (PPP) method applied to GPS data in combined carrier-phase and pseudorange mode as well as in pseudorange-only mode to show their relative merits. The PPP solutions in combined carrier-phase and pseudorange mode showed the least instability of the methods tested herein at all scales, at few parts in 1015 at 1 day for the stations processed, following a tau−½ interval dependency. Conversely, the PPP solutions in pseudorange-only mode are an order of magnitude worst (few parts in 1014 at 1 day for the stations processed) following a tau−1 power-law, but slightly better than the single-satellite raw GPS time transfer solutions obtained using the developed software, since the PPP least-squares solution effectively averages the pseudorange noise. The pseudorange noise levels estimated from PPP pseudorange residuals and from clock solution comparisons are largely consistent, providing a validation of our software operation. The raw GIOVE-B time transfer, as implemented in this work, proves to be slightly better than single-satellite raw GPS satellite time transfer, at least in the medium term. However, one of the processed stations shows a combined GPS P1 and P2 pseudorange noise level at 2 m, a factor 2 worst than usually seen for geodetic receivers, so the GPS time transfer results may not be at their best for the cases processed. Over the short term, the GPS single-satellite time transfer instability outperforms the GIOVE-B by an order of magnitude at 1 s interval, which would be due to the different characteristics of the tracking loop filters for GPS P1 and P2 on one hand and the GIOVE-B signals on the other. Even at this preliminary stage and using an experimental satellite system, results show that the GIOVE-B (and hence Galileo) signals offer interesting perspectives for high precision time transfer between metrological laboratories.  相似文献   

12.
The state-space representation (SSR) product of satellite orbit and clock is one of the most essential corrections for real-time precise point positioning (RTPPP). When it comes to PPP ambiguity resolution (PPP-AR), the fractional cycle bias (FCB) matters. The Japan Aerospace Exploration Agency (JAXA) has developed a multi-GNSS (i.e., global navigation satellite system) advanced demonstration tool for orbit and clock analysis (MADOCA), providing free and precise orbit and clock products. Because of the shortage of relevant studies on performance evaluation, this paper focuses on the performance assessment of RTPPP and PPP-AR by real-time and offline MADOCA products. To begin with, the real-time MADOCA products are evaluated by comparing orbit and clock with JAXA final products, which gives an objective impression of the correction. Second, PPP tests in static and simulated kinematic mode are conducted to further verify the quality of real-time MADOCA products. Finally, the offline MADOCA products are assessed by PPP and PPP-AR comparisons. The results are as follows: (1) Orbit comparisons produced an average error of about 0.04–0.13 m for the global positioning system (GPS), 0.14–0.16 m for the global navigation satellite system (GLONASS), and 0.07–0.08 m for the quasi-zenith satellite system (QZSS). The G15 satellite had the most accurate orbit, with a difference of 0.04 m between the JAXA orbit products and MADOCA’s counterpart, while the R07 satellite had the least accurate orbit with a difference of 0.16 m. Clock products had an accuracy of 0.4–1.3 ns for GPS, 1.4–1.6 ns for GLONASS, and 0.7–0.8 ns for QZSS in general. The G15 satellite had the most accurate clock with a difference of only 0.40 ns between the JAXA clock products and MADOCA products, and the R07 satellite had the least accurate clock with a difference of 1.55 ns. The orbit and clock products for GLONASS performed worse than those of GPS and QZSS. (2) After convergence, the positioning accuracy was 3.0–8.1 cm for static PPP and 8.1–13.7 cm for kinematic PPP when using multi-GNSS observations and precise orbit and clock products. The PFRR station performed the good performance both in static and kinematic mode with an accuracy of 2.99 cm and 8.08 cm, respectively, whereas the CPNM station produced the worst static performance with an error of 8.09 cm, and the ANMG station produced the worst kinematic performance with a counterpart of 13.69 cm. (3) The PPP-AR solution was superior to the PPP solution, given that, with respect to PPP, post-processing PPP-AR improved the positioning accuracy and convergence time by 13–32 % (3–89 %) in GPS-only mode by 2–15 % (5–60 %) in GPS/QZSS mode. Thus, we conclude that the current MADOCA products can provide SSR corrections and FCB products with positioning accuracy at the decimeter or even centimeter level, which could meet the demands of the RTPPP and PPP-AR solutions.  相似文献   

13.
The Geodetic Observatory Pecný (GOP) routinely estimates near real-time zenith total delays (ZTD) from GPS permanent stations for assimilation in numerical weather prediction (NWP) models more than 12 years. Besides European regional, global and GPS and GLONASS solutions, we have recently developed real-time estimates aimed at supporting NWP nowcasting or severe weather event monitoring. While all previous solutions are based on data batch processing in a network mode, the real-time solution exploits real-time global orbits and clocks from the International GNSS Service (IGS) and Precise Point Positioning (PPP) processing strategy. New application G-Nut/Tefnut has been developed and real-time ZTDs have been continuously processed in the nine-month demonstration campaign (February–October, 2013) for selected 36 European and global stations. Resulting ZTDs can be characterized by mean standard deviations of 6–10 mm, but still remaining large biases up to 20 mm due to missing precise models in the software. These results fulfilled threshold requirements for the operational NWP nowcasting (i.e. 30 mm in ZTD). Since remaining ZTD biases can be effectively eliminated using the bias-reduction procedure prior to the assimilation, results are approaching the target requirements in terms of relative accuracy (i.e. 6 mm in ZTD). Real-time strategy and software are under the development and we foresee further improvements in reducing biases and in optimizing the accuracy within required timeliness. The real-time products from the International GNSS Service were found accurate and stable for supporting PPP-based tropospheric estimates for the NWP nowcasting.  相似文献   

14.
Single-frequency precise point positioning (SF-PPP) has attracted increasing attention due to its high precision and cost effectiveness. With various strategies to handle the dominant error, i.e., ionosphere delay, the ionosphere-float (IF), ionosphere-free-half (IFH), ionosphere-corrected (IC), and ionosphere-weighted (IW) SF-PPP models are certain to possess different characteristics and performance levels. This study is dedicated to assessing and comparing the four models from model characteristics, positioning performance, and atmosphere delay retrieval. The model comparison shows that IC and IW models are full-rank while IF and IFH models have a rank deficiency of size one that will result in biased estimations, which means the better solvability of IC and IW models. The experiments are carried out based on the 7-day Global Positioning System (GPS) observations collected at 57 global Multi-GNSS Experiment (MGEX) stations and Global Ionosphere Map (GIM) products. The results indicate that the IW model can accelerate SF-PPP convergence and achieve higher positioning accuracy compared to the other three SF-PPP models, especially in kinematic mode. With convergence criteria of 0.25 m in horizontal and 0.5 m in vertical, the east/north/up convergence times of IW model are 0.5/15.0/25.0 min and 0.5/16.0/36.5 min for static and kinematic modes, respectively. The IW model is able to achieve an instantaneous positioning accuracy of 0.28/0.35/0.75 m. In addition, a real kinematic test also demonstrates the best positioning solutions of IW model. Regarding troposphere delay retrieval, the IF, IFH, and IW models obtain a comparable daily accuracy of 3.0 cm on average, while the IC model achieves the worst accuracy of 8.0 cm. For precise ionosphere delay estimation, IW model only needs an average initialization time of 34.3 min, but a longer initialization time of 51.6 min is required for IF model. The daily precision of ionosphere delay estimation for IW model can reach up to 10.8 cm. At the present accuracy of GIM products, it is suggested that the IW model should be adopted for SF-PPP first due to its superior performance in positioning and atmosphere delay retrieval.  相似文献   

15.
We have used microwave absorbing material in different geometries around ground-based Global Navigation Satellite System (GNSS) antennas in order to mitigate multipath effects on the estimates of station coordinates and atmospheric water vapour. The influence of a hemispheric radome – of the same type as in the Swedish GPS network SWEPOS – was also investigated. Two GNSS stations at the Onsala Space Observatory were used forming a 12 m baseline. GPS data from October 2008 to November 2009 were analyzed by the GIPSY/OASIS II software using the Precise Point Positioning (PPP) processing strategy for five different elevation cutoff angles from 5° to 25°. We found that the use of the absorbing material decreases the offset in the estimated vertical component of the baseline from ∼27 mm to ∼4 mm when the elevation cutoff angle varies from 5° to 20°. The horizontal components are much less affected. The corresponding offset in the estimates of the atmospheric Integrated Water Vapour (IWV) decreases from ∼1.6 kg/m2 to ∼0.3 kg/m2. Changes less than 5 mm in the offsets in the vertical component of the baseline are seen for all five elevation cutoff angle solutions when the antenna was covered by a hemispheric radome. Using the radome affects the IWV estimates less than 0.4 kg/m2 for all different solutions. IWV comparisons between a Water Vapour Radiometer (WVR) and the GPS data give consistent results.  相似文献   

16.
Precise point positioning with ambiguity resolution (PPP-AR) is a useful tool for high-precision geodetic and geophysical applications, while phase bias products are the prerequisite to implement PPP-AR. Wuhan University has been providing the final (the best operationally post-processing solution based) phase clock/bias products with a latency of two weeks since March of 2019, while a dedicated open-source software package PRIDE PPP-AR is released to leverage these products for high-precision positioning. In order to satisfy some both time and precision critical applications, such as rapid earthquake response, Wuhan University also released rapid (with comparable quality but with much shorter delivery latency) phase clock/bias products with a latency of less than 24 h and updated PRIDE PPP-AR in July 2019. We first introduce the phase clock/bias generation and validation schemes and the maintenance of routine products provision. Then, with 14 days (July 2 to July 15 in 2019) of GPS data collected from 146 globally distributed IGS (International GNSS Service) stations, we evaluated the positioning performance of the rapid products with respect to their final counterparts. It is found that positioning precision of PPP-AR using rapid products is comparable to that using final products, especially in kinematic positioning mode. When rapid products are used, the RMS of PPP-AR in static mode with respect to IGS weekly solutions can reach 1.7 mm, 1.8 mm and 5.5 mm in the east, north and up components, respectively. Furthermore, the RMS of epoch-wise positions with respect to daily solutions for the east, north and up components are 0.51 cm, 0.57 cm and 1.51 cm for PPP-AR with rapid products in kinematic mode. It demonstrates that the rapid phase clock/bias products can sufficiently meet the precision requirement of most geodetic and geophysical applications yet with much shorter time delay. Finally, we study the July 6th M7.1 2019 Ridgecrest, California earthquake using the rapid phase clock/bias products and demonstrate their comparable performance against the final products.  相似文献   

17.
Integer ambiguity resolution in precise point positioning (PPP) can shorten the initialization and re-initialization time, and ambiguity-fixed PPP solutions are also more reliable and accurate than ambiguity-float PPP solutions. However, signal interruptions are unavoidable in practical applications, particularly while operating in urban areas. Such signal interruptions can cause discontinuity of carrier phase arc, which introduces new integer ambiguities. Usually it will take approximately 15 min of continuous tracking to a reasonable number of satellites to fix new integer ambiguities. In many applications, it is impractical for a PPP user to wait for such a long time for the re-initialization. In this paper, a method for rapid ambiguity fixing in PPP is developed to avoid such a long re-initialization time. Firstly, the atmospheric delays were estimated epoch by epoch from ambiguity-fixed PPP solutions before the data gap or cycle slip occurs. A random walk procedure is then applied to predict the atmospheric delays accurately over a short time span. The predicted atmospheric delays then can be used to correct the observations which suffer from signal interruptions. Finally, the new ambiguities can be fixed with a distinct WL-LX-L3 (here LX denotes either of L1, L2) cascade ambiguity resolution strategy. Comprehensive experiments have demonstrated that the proposed method and strategy can fix zero-difference integer ambiguities successfully with only a single-epoch observation immediately after a short data gap. This technique works even when all satellites are interrupted at the same time. The duration of data gap bridged by this technique could be possibly extended if a more precise atmospheric delay prediction is found or on-the-fly (OTF) technology is applied. Based on the proposed method, real-time PPP with integer ambiguity fixing becomes more feasible in practice.  相似文献   

18.
In order to speed up Precise Point Positioning (PPP)’s convergence, a combined PPP method with GPS and GLONASS which is based on using raw observations is proposed, and the positioning results and convergence time have been compared with that of single system. The ionospheric delays and receiver’s Differential Code Bias (DCB) corrections are estimated as unknown parameters in this method. The numerical results show that the combined PPP has not caused significant impacts on the final solutions, but it greatly improved Position Dilution of Precision (PDOP) and convergence speed and enhanced the reliability of the solution. Meanwhile, the convergence speed is greatly influenced by the receiver’s DCB, positioning results in horizontal which are better than 10 cm can be realized within 10 min. In addition, the ionosphere and DCB products can be provided with high precision.  相似文献   

19.
GPS data dedicated to sea surface observation are usually processed using differential techniques. Unfortunately, the precision of resulting kinematic positions is baseline-length dependent. So, high precision sea surface observations using differential GPS techniques are limited to coasts, lakes, and rivers. Recent improvements in GPS satellite products (orbits, clocks, and phase biases) make phase ambiguity fixing at the zero difference level achievable and opens up the observation of the sea surface without geographical constraints. This paper recalls the concept of the Integer Precise Point Positioning technique and discusses the precision of GPS buoy positioning. A sequential version of the GINS software has been implemented to achieve single epoch GPS positioning. We used 1 Hz data from a two week GPS campaign conducted in the Kerguelen Islands. A GPS buoy has been moored close to a radar gauge and 90 m away from a permanent GPS station. This infrastructure offers the opportunity to compare both kinematic Integer Precise Point Positioning and classical differential GPS positioning techniques to in situ radar gauge data. We found that Precise Point Positioning results are not significantly biased with respect to radar gauge data and that horizontal time series are consistent with differential processing at the sub-centimetre precision level. Nevertheless, standard deviations of height time series with respect to radar gauge data are typically [4–5] cm. The dominant driver for noise at this level is attributed to errors in tropospheric estimates which propagate into position solutions.  相似文献   

20.
Since China’s BeiDou satellite navigation system (BDS) began to provide regional navigation service for Asia-Pacific region after 2012, more new generation BDS satellites have been launched to further expand BDS’s coverage to be global. In this contribution, precise positioning models based on BDS and the corresponding mathematical algorithms are presented in detail. Then, an evaluation on BDS’s real-time dynamic positioning and navigation performance is presented in Precise Point Positioning (PPP), Real-time Kinematic (RTK), Inertial Navigation System (INS) tightly aided PPP and RTK modes by processing a set of land-borne vehicle experiment data. Results indicate that BDS positioning Root Mean Square (RMS) in north, east, and vertical components are 2.0, 2.7, and 7.6?cm in RTK mode and 7.8, 14.7, and 24.8?cm in PPP mode, which are close to GPS positioning accuracy. Meanwhile, with the help of INS, about 38.8%, 67.5%, and 66.5% improvements can be obtained by using PPP/INS tight-integration mode. Such enhancements in RTK/INS tight-integration mode are 14.1%, 34.0%, and 41.9%. Moreover, the accuracy of velocimetry and attitude determination can be improved to be better than 1?cm/s and 0.1°, respectively. Besides, the continuity and reliability of BDS in both PPP and RTK modes can also be ameliorated significantly by INS during satellite signal missing periods.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号