共查询到20条相似文献,搜索用时 31 毫秒
1.
David L 《Aerospace America》2002,40(4):36-8,41-3
Rising costs of the International Space Station prompted NASA to convene a panel of experts to assess the quality of ISS cost estimates and review program assumptions and requirements. The panel concluded that NASA was unable to accurately predict ISS costs or to support requests for increased funding for the ISS through 2006 and should maintain a U.S. core complete program with three-person crews with 6-month stays on the ISS. International response to the panel report was negative with space agencies from Japan, Russia, Canada, and Europe taking issue with the expected impact on ISS construction and use. 相似文献
2.
国际空间站(ISS)针对有效载荷从论证、研制到随ISS飞行的过程建立了标准集成流程和精益集成流程两种模式,这两种模式互为补充,有效支持了ISS载荷随飞行任务的滚动实施。在有效载荷集成过程中,NASA采用多线并行的方式,其集成流程从理念上不完全等同于传统卫星有效载荷随飞行任务实施的研制流程,并设置有效载荷集成经理,架设有效载荷管理方、研制方和研究团队之间的桥梁。通过对国际空间站有效载荷集成过程的深入分析,提出可供我国空间站有效载荷集成借鉴的经验,如提供快速集成流程、加强有效载荷集成管理、强化有效载荷全寿命周期管理等。 相似文献
3.
Jones TD 《Aerospace America》2003,41(4):16-18
In a new column, the author reviews NASA space activities since the beginning of 2003 and looks at plans for the future. Topics include the Space Shuttle Columbia, what's in store for the International Space Station (ISS), the development of an orbital space plane, orbiter safety upgrades, and the future of space exploration and research beyond the ISS. He presents arguments for sending astronauts to asteroids, the Moon, and Mars. 相似文献
4.
Schmidt GK 《Aerospace America》2002,40(12):96-97
Space life sciences research activities are reviewed for the year. Highlights of animal studies were the first long-term flight of an animal enclosure module and an avian development facility on STS-108. Plant research efforts focused on a biomass production system for eventual use on the International Space Station (ISS), the PESTO experiment on ISS, and screening of several salad crop varieties for potential use in space. Health-related studies included the Martian Radiation Environment Experiment (MARIE) on the Mars Odyssey mission, presentation of results from NASA's Biomolecular Physics and Chemistry Program, and research related to human liver cell function in space through an agreement with StelSys. In industry and academia, a memorandum of understanding was signed between NASA and the biotechnology industry to enhance communication between NASA and the industry, expand commercial biotechnology space research and development, and expand formal and informal education of industry and the public regarding biotechnology and space research. NASA selected Purdue University to lead an NSCORT for advanced life support research to develop technologies to enable long-duration planetary mission and sustain human space colonies. 相似文献
5.
Flinn ED 《Aerospace America》2002,40(7):12-14
The Materials International Space Station Experiment (MISSE) is described. This project is designed to conduct long duration materials tests on samples attached to the ISS. A batch of 750 material samples were delivered on STS-105 and attached to the ISS airlock. They will be exposed to the space environment for 18 months and are slated to return on STS-114. A second batch of 750 samples is being prepared. The experiment containers were used originally for the Mir Environmental Effects Payload, which tested a variety of substances, including some slated for use on the ISS. Researchers are particularly interested in the effects of atomic oxygen on the samples. Some samples are being tested to determine their use in radiation protection. As part of the MISSE project, ultrathin tether materials are being tested for use on the Propulsive Small Expendable Depoloyer System (ProSEDS), which will use a tether system to change a satellite's orbital altitude. 相似文献
6.
《Aerospace Science and Technology》2007,11(6):490-498
The Automated Transfer Vehicle (ATV) is a European spacecraft intended to service the International Space Station (ISS). It is designed to perform automated phasing, approach, rendezvous and docking to the ISS, then departure and deorbitation manoeuvres. Such an automated rendezvous mission towards a manned facility raises severe performance and safety constraints for the vehicle, which are declined towards the on-board Navigation in terms of availability, accuracy and failure tolerance: the ATV shall be operational after any first failure and safe conditions shall be reached after a second failure. The whole ATV navigation system has been designed to fulfil these very stringent requirements. Based on fully redundant hardware, the navigation algorithms present optimal estimators and multi-layers Failure, Detection, Isolation and Recovery (FDIR) capabilities to ensure the continuity of the state vector in case of failure. Several functions provide state vectors estimations and health reports, according to the flight phase: the attitude and drift estimation function provides the vehicle absolute attitude and angular rate during the whole flight; for the far rendezvous, position and velocity relative to the ISS are estimated by the relative GPS navigation and a dedicated relative navigation with Videometer applies in close rendezvous, in the final approach. All these autonomous navigation functions offer nevertheless a high level of monitoring and control to the ATV Control Centre operators. Thus the ATV innovative navigation chain provides the high level of performance, robustness and autonomy required by modern spacecrafts involved in human programs, today in Earth orbit but also for future space exploration missions. 相似文献
7.
8.
9.
The construction of the International Space Station (ISS) may involve several thousand hours of space walks or “extravehicular activities” (EVAs). Among the many risks involved in EVAs, we focus here on potential failures of the external maneuvering unit (EMU) caused by impacts of space particles (micro-meteoroids and orbital debris). We present a probabilistic risk analysis (PRA) model based on available data for the particle flux in low Earth orbit as well as test data obtained at Johnson Space Center about the capacity of the current EMU to absorb these loads. We computed the risk for a peak year of EVA activity, assumed by NASA to consist of 624 hours of EVA exposure. For that time period, we found that, the probability of a fatality is about 1.4*10-3 without shielding and 1.1*10-3 per 624 hours of EVA with shielding, This model can be used as support for a number of decisions regarding space suit design, astronaut shielding options, and overall number of EVA hours for space station construction and operation 相似文献
10.
11.
文章从传感器的重要性及"经济上可承受性"引出了"综合传感器系统(ISS)概念"并对其定义、实现方法和验证结果及目前存在问题进行了分析.特别是对孔径综合、射频综合和ISS管理做了图示说明.指出传感器综合技术是本世纪初航空电子的关键技术,对未来作战飞机有致关重要的影响,并就我国开展这项关键技术研究提出了有益建议. 相似文献
12.
Rich B.A. Lehnerd P.J. Gracia J.A. 《Aerospace and Electronic Systems Magazine, IEEE》1995,10(9):11-17
Projection of avionics system costs shows unacceptable escalation as a percentage of flyaway cost. Time sharing of RF modules between Radar, EW and CNI offers savings. The Air Forces' PAVE PACE program defined the benefits and initial architecture approaches. From this, an optimum Integrated Sensor System (ISS) design was defined that reduces the life cycle cost of the fleet of vehicles using the common modules. The ISS program will design, build and test modules to prove the approach. Challenges to overcome include system complexity, real time control, test and calibration, and diagnostics. The most stressing requirements were determined by analyzing requirements for Radar, EW and CNI. Open interface specifications and module partitioning were developed that can meet all the requirements 相似文献
13.
A summary form is given of the author's full paper (ibid. vol. 33, p. 7, 1998). The ISS program is a huge investment by the U.S. government. It is estimated by NASA that the program will cost the American public more than $70 billion over a period of 30 years. Since the scientific impact of this program is relatively unknown (and uncertain), the question that policy makers will have to struggle with is whether the federal government should continue to fund the program, or to pull out from the program altogether, thus saving American taxpayers close to $30 billion. Although funding is a major concern, since the inclusion of Russia in the program, the ISS has also become a foreign policy tool. Therefore, additional questions about policy implications of the ISS program need to be addressed 相似文献
14.
《Aerospace Science and Technology》2001,5(5):365-381
This paper discusses the dynamic modeling and simulation techniques for the X-38 re-entry spacecraft, a prototype crew return vehicle (CRV) for the international space station (ISS). A general simulator for atmospheric re-entry dynamics (GESARED) was developed in the Matlab/Simulink environment. The 6 degree-of-freedom re-entry flight dynamics were modeled to achieve minimum restrictions and singularities. Quaternion representation of vehicle attitude was used to avoid computational singularities in angular kinematic model equations. The Earth's atmosphere, Earth's shape and gravitational potential were modeled appropriately. The vehicle's aerodynamic characteristics, navigation sensors, and the actuator dynamics were also modeled and implemented. Several numerical simulation tests and analyses were conducted to evaluate the performance of the model equations and the simulator. 相似文献
15.
16.
《Aerospace and Electronic Systems Magazine, IEEE》2003,18(5):32-39
As the Earth-orbit International Space Station (ISS) grows, it needs more power which is generated by solar panels. For periods in which the planet Earth occults sunlight, energy is stored in the biggest set of batteries ever flown in space. Reliability of power is important in a space station because a failure requires costly launch of replacement components. Even greater importance results when astronauts work in the station. A power failure that causes the astronauts to perish would be a very serious event. The first battery-containing "integrated equipment module" was launched November 30, 2000 and installed on port 6 of the International Space Station. Two more modules will be launched by the United States; to be launched in 2004 is the European Space Agency's "attached COLUMBUS APM laboratory," which will have its own power system. Unexpected battery-related events occurred in the integrated equipment module during its first year-and-a-half in orbit. The problems and their solutions were described in papers presented at the 37/sup th/ Intersociety Energy Conversion Engineering Conference. Since the International Space Station carries more battery cells than any other spacecraft, the in-flight performance data from its battery assembly can be useful to engineers who design power supplies for other spacecraft. We, therefore, summarize the battery development process, the adopted design, and an unexpected in-flight battery degradation and its correction. 相似文献
17.
18.
Space life sciences research activities are reviewed for 2003. Many life sciences experiments were lost with the tragic loss of STS-107. Life sciences experiments continue to fly as small payloads to the International Space Station (ISS) via the Russian Progress vehicle. Health-related studies continue with the Martian Radiation Environment Experiment (MARIE) aboard the Odyssey spacecraft, collecting data on the radiation environment in Mars orbit. NASA Ames increased nanotechnology research in all areas, including fundamental biology, bioastronautics, life support systems, and homeland security. Plant research efforts continued at NASA Kennedy, testing candidate crops for ISS. Research included plant growth studies at different light intensities, varying carbon dioxide concentrations, and different growth media. Education and outreach efforts included development of a NASA/USDA program called Space Agriculture in the Classroom. Canada sponsored a project called Tomatosphere, with classrooms across North America exposing seeds to simulated Mars environment for growth studies. NASA's Office of Biological and Physical Research released an updated strategic research plan. 相似文献
19.
Frank Zimmermann Ulrich M. Schttle Ernst Messerschmid 《Aerospace Science and Technology》2005,9(8):713-721
This paper presents the mission analysis of a tether-assisted payload retrieval from the International Space Station (ISS). The objective is to assess all relevant phases of such a mission in order to allow a comparison with a conventional mission employing a propulsive deorbitation. The controlled tether deployment procedure and the guided return flight of the released re-entry capsule are optimized. A preferable deployment strategy is identified that allows for favorable entry conditions and low flight loads. The optimal deployment trajectories serve as a basis for an optimal dynamic regulator. This approach is extended towards an adaptive concept, where artificial neural networks are applied to deployment control. For the guidance of the capsule a predictive concept is proposed that is based on the optimal re-entry trajectories identified previously. By applying these concepts, the attainable landing accuracy during return amounts to an average of 5 km, and the application of the tether system exhibits overall system mass advantages. This demonstrates that the tether-assisted return mission is a competitive alternative. 相似文献
20.
Cassini Imaging Science: Instrument Characteristics And Anticipated Scientific Investigations At Saturn 总被引:1,自引:0,他引:1
Carolyn C. Porco Robert A. West Steven Squyres Alfred Mcewen Peter Thomas Carl D. Murray Anthony Delgenio Andrew P. Ingersoll Torrence V. Johnson Gerhard Neukum Joseph Veverka Luke Dones Andre Brahic Joseph A. Burns Vance Haemmerle Benjamin Knowles Douglas Dawson Thomas Roatsch Kevin Beurle William Owen 《Space Science Reviews》2004,115(1-4):363-497
The Cassini Imaging Science Subsystem (ISS) is the highest-resolution two-dimensional imaging device on the Cassini Orbiter and has been designed for investigations of the bodies and phenomena found within the Saturnian planetary system. It consists of two framing cameras: a narrow angle, reflecting telescope with a 2-m focal length and a square field of view (FOV) 0.35∘ across, and a wide-angle refractor with a 0.2-m focal length and a FOV 3.5∘ across. At the heart of each camera is a charged coupled device (CCD) detector consisting of a 1024 square array of pixels, each 12 μ on a side. The data system allows many options for data collection, including choices for on-chip summing, rapid imaging and data compression. Each camera is outfitted with a large number of spectral filters which, taken together, span the electromagnetic spectrum from 200 to 1100 nm. These were chosen to address a multitude of Saturn-system scientific objectives: sounding the three-dimensional cloud structure and meteorology of the Saturn and Titan atmospheres, capturing lightning on both bodies, imaging the surfaces of Saturn’s many icy satellites, determining the structure of its enormous ring system, searching for previously undiscovered Saturnian moons (within and exterior to the rings), peering through the hazy Titan atmosphere to its yet-unexplored surface, and in general searching for temporal variability throughout the system on a variety of time scales. The ISS is also the optical navigation instrument for the Cassini mission. We describe here the capabilities and characteristics of the Cassini ISS, determined from both ground calibration data and in-flight data taken during cruise, and the Saturn-system investigations that will be conducted with it. At the time of writing, Cassini is approaching Saturn and the images returned to Earth thus far are both breathtaking and promising.This revised version was published online in July 2005 with a corrected cover date. 相似文献