首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 46 毫秒
1.
2.
The French earth observation satellite SPOT-2 has served as a testbed for precise orbit determination from DORIS doppler tracking in anticipation of the TOPEX/Poseidon mission. Using the most up-to-data gravity field model, JGM-2, a radial orbit accuracy of about 2–9 cm was achieved, with an rms of fit of the tracking data of about 0.64 mm/s. Furthermore, it was found that the coordinates of the ground stations can be determined with an accuracy of the order of 2–5 cm after removal of common rotations, and translations.

Using a slightly different model for atmospheric drag, but the same gravity model, precise orbits of TOPEX/Poseidon from DORIS tracking data were determined with a radial orbit accuracy of the order of 4–5 cm, which is far within the 13 cm mission requirement. This conclusion is based on the analysis of 1-day overlap of successive 11-day orbits, and the comparisons with orbits computed from satellite laser tracking (SLR) and from the combination of SLR and DORIS tracking. Results indicate a consistency between the different orbits of 1–4 cm, 4–20 cm, and 6–13 cm in the radial, cross-track, and along-track directions, respectively. The residual rms is about 4–5 cm for SLR data and 0.56 mm/s for DORIS tracking. These numbers are roughly twice as large as the system noise levels, reflecting the fact that there are still some modeling errors left.  相似文献   


3.
Doppler Orbitography Radiopositionning Integrated by Satellite (DORIS) is one of the four fundamental techniques contributing to the ITRF. The optimal coverage over the globe of the DORIS observing sites and sites co-located with GPS, allow a strong embedding of DORIS within the ITRF network. DORIS contributes to the access to ITRF through precise orbit determination of altimetric satellites with onboard DORIS receivers. The DORIS contribution to the ITRF2008 is enhanced by the fact that the solutions of seven analysis centers were included in the submitted combined time series of weekly station positions and daily polar motion. We evaluate the quality of the DORIS combined solution in terms of its agreement with the other techniques (VLBI, SLR, GPS) contributing to the ITRF2008 combination. We show in particular that the precisions of the current IDS products range between 1.5 to 2.6 mm for station positions (at the epochs of minimum variances); better than 1 mm/yr in velocities and between 170 and 260 micro-arc-seconds for polar motion, a significant improvement by a factor of three to five, compared to past data used in the ITRF2005 combination. This improvement is certainly due to improved analysis strategies employed by the seven IDS analysis centers that contributed to the combined weekly submitted solutions of station positions and polar motion. A spectral analysis of DORIS station height time series indicates that annual and semi-annual signals are dominant. However, TOPEX draconitic period of about 118 days is still detected in about 20% of the station position power spectra. DORIS height annual signals correlate well with GPS annual signal estimated at some co-located stations, which show that DORIS technique is able to detect loading signals.  相似文献   

4.
In its function as an ITRS Combination Centre, DGFI is in charge with the computation of an ITRF2008 solution. The computation methodology of DGFI is based on the combination of datum-free normal equations (weekly or session data sets, respectively) of station positions and Earth orientation parameters (EOP) from the geodetic space techniques DORIS, GPS, SLR and VLBI. In this paper we focus on the DORIS part within the ITRF2008 computations. We present results obtained from the analysis of the DORIS time series for station positions, network translation and scale parameters, as well as for the terrestrial pole coordinates. The submissions to ITRF2008 benefit from improved analysis strategies of the seven contributing IDS analysis centres and from a combination of the weekly solutions of station positions and polar motion. The results show an improvement by a factor of two compared to past DORIS data submitted to ITRF2005, which has been evaluated by investigating the repeatabilities of position time series. The DORIS position time series were analysed w.r.t. discontinuities and other non-linear effects such as seasonal variations. About 40 discontinuities have been identified which have been compared with the results of an earlier study. Within the inter-technique combination we focus on the DORIS contribution to the integration of the different space geodetic observations and on a comparison of the geodetic local ties with the space geodetic solutions. Results are given for the 41 co-location sites between DORIS and GPS.  相似文献   

5.
DORIS is a tracking system developed by CNES to support precise orbit computation of the US-French TOPEX/POSEIDON project. Moreover DORIS data are currently processed to compute SPOT2 and SPOT3 orbits. Although the SPOT satellites are at 800 km altitudes, their orbits reach the decimetric level, to be compared to the 3–4 cm RMS on the T/P radial component.For each type of orbit, there is an adaptive period of a few months which is used for improving the precision. The paper describes what has been done to reduce some items in the total error budget. The latest results will be presented as well as the criteria which are settled to characterize the improvements.Finally, the future developments of DORIS and the potential projects flowing DORIS will be outlined such as ENVISAT and TOPEX/POSEIDON Follow On.  相似文献   

6.
For Precise Orbit Determination of altimetry missions, we have computed a data set of DORIS station coordinates defined for specific time intervals called DPOD2005. This terrestrial reference set is an extension of ITRF2005. However, it includes all new DORIS stations and is more reliable, as we disregard stations with large velocity formal errors as they could contaminate POD computations in the near future. About 1/4 of the station coordinates need to be defined as they do not appear in the original ITRF2005 realization. These results were verified with available DORIS and GPS results, as the integrity of DPOD2005 is almost as critical as its accuracy. Besides station coordinates and velocities, we also provide additional information such as periods for which DORIS data should be disregarded for specific DORIS stations, and epochs of coordinate and velocity discontinuities (related to either geophysical events, equipment problem or human intervention). The DPOD model was tested for orbit determination for TOPEX/Poseidon (T/P), Jason-1 and Jason-2. Test results show DPOD2005 offers improvement over the original ITRF2005, improvement that rapidly and significantly increases after 2005. Improvement is also significant for the early T/P cycles indicating improved station velocities in the DPOD2005 model and a more complete station set. Following 2005 the radial accuracy and centering of the ITRF2005-original orbits rapidly degrades due to station loss.  相似文献   

7.
DORIS system: The new age   总被引:1,自引:0,他引:1  
The boarding of the first DGXX DORIS instrument on Jason-2 mission gives us the opportunity to present the improvements that have been implemented on the DORIS system. The goal of this paper is to present information about the new capacities of the DORIS system and to give the current status of its components. An overview of the DORIS system, the International DORIS Service and the Jason-2 satellite mission are first presented. Then the new characteristics of the on-board instrument are detailed. The capacity to track up to seven ground beacons simultaneously dramatically increases the number of measurements performed: a factor of three increase over Jason-1 is observed at the altitude of 1330 km. It also increases the diversity of directions of observation and allows low elevation measurements from 0°. The new phase measurements capability allows now phase processing. The instability of the Jason-1 USOs (Ultra-Stable Oven-controlled quartz oscillator) while crossing the South Atlantic Anomaly has been solved by decreasing the sensitivity to radiation by a factor of 10. New features of the on-board software enhance the coastal and inland water altimetry and increase the robustness of the data. The new software also improves the real time orbit accuracy for operational altimetry. The improvements introduced concurrently on the ground segment have also significantly enhanced capability. The new RINEX exchange formats provide simultaneous phase and pseudo-range measurements. The maintenance of the DORIS Beacons Network and the work done by the DORIS Signal Integrity monitoring team lead to an increased availability of the Network from 75% to 90% and so to a more homogenous orbit coverage.  相似文献   

8.
The NASA GSFC DORIS analysis center has provided weekly DORIS solutions from November 1992 to January 2009 (839 SINEX files) of station positions and Earth Orientation Parameters for inclusion in the DORIS contribution to ITRF2008. The NASA GSFC GEODYN orbit determination software was used to process the orbits and produce the normal equations. The weekly SINEX gscwd10 submissions included DORIS data from Envisat, TOPEX/Poseidon, SPOT-2, SPOT-3, SPOT-4, SPOT-5. The orbits were mostly seven days in length (except for weeks with data gaps or maneuvers). The processing used the GRACE-derived EIGEN-GL04S1 gravity model, updated modeling for time-variable gravity, the GOT4.7 ocean tide model and tuned satellite-specific macromodels for SPOT-2, SPOT-3, SPOT-4, SPOT-5 and TOPEX/Poseidon. The University College London (UCL) radiation pressure model for Envisat improves nonconservative force modeling for this satellite, reducing the median residual empirical daily along-track accelerations from 3.75 × 10−9 m/s2 with the a priori macromodel to 0.99 × 10−9 m/s2 with the UCL model. For the SPOT and Envisat DORIS satellite orbits from 2003 to 2008, we obtain average RMS overlaps of 0.8–0.9 cm in the radial direction, 2.1–3.4 cm cross-track, and 1.7–2.3 cm along-track. The RMS orbit differences between Envisat DORIS-only and SLR & DORIS orbits are 1.1 cm radially, 6.4 cm along-track and 3.7 cm cross-track and are characterized by systematic along-track mean offsets due to the Envisat DORIS system time bias of ±5–10 μs. We obtain a good agreement between the geometrically-determined geocenter parameters and geocenter parameters determined dynamically from analysis of the degree one terms of the geopotential. The intrinsic RMS weekly position repeatability with respect to the IDS-3 combination ranges from 2.5 to 3.0 cm in 1993–1994 to 1.5 cm in 2007–2008.  相似文献   

9.
DORIS is one of the four geodetic space techniques participating to the Global Geodetic Observing System (GGOS). Since the early development of this system, the Institut Géographique National played a specific and active role. Within, the International DORIS Service (IDS), IGN is in a particular position. While it is responsible for the installation and the maintenance of the DORIS ground tracking stations, it also handles one of the two IDS data center delivering DORIS data and products and has been an IDS Analysis Center for years, providing all possible IDS products, in particular the latest ignwd08 time series in preparation of ITRF2008. This paper explains the different aspects of the IGN contribution to IDS from an historical point of view, presents current activities and scientific results and provides a perspective for future activities. Recent DORIS results show a 10 mm precision or better when more than four DORIS satellites are available. Comparisons between recent DORIS solutions (ign07d02 and ign09d02) and past ITRF realizations show that errors are shared between the DORIS and the ITRF realizations. Some problems related to DORIS data processing are also discussed and possible ways to solve them in the future are discussed. In particular, we can now reject the tropospheric origin of the problem detected in the Envisat data after the software upload of October 12, 2004. A few applications in geodesy (terrestrial reference frame, Earth’s polar motion) and geophysics are also discussed as a natural extension of these service-type activities.  相似文献   

10.
Geoscience Australia contributed a multi-satellite, multi-year weekly time series to the International DORIS Service combined submission for the construction of International Terrestrial Reference Frame 2008 (ITRF2008). This contributing solution was extended to a study of the capability of DORIS to dynamically estimate the variation in the geocentre location. Two solutions, comprising different constraint configurations of the tracking network, were undertaken. The respective DORIS satellite orbit solutions (SPOT-2, SPOT-4, SPOT-5 and Envisat) were verified and validated by comparison with those produced at the Goddard Space Flight Center (GSFC), DORIS Analysis Centre, for computational consistency and standards. In addition, in the case of Envisat, the trajectories from the GA determined SLR and DORIS orbits were compared. The results for weekly dynamic geocentre estimates from the two constraint configurations were benchmarked against the geometric geocentre estimates from the IDS-2 combined solution. This established that DORIS is capable of determining the dynamic geocentre variation by estimating the degree one spherical harmonic coefficients of the Earth’s gravity potential. It was established that constrained configurations produced similar results for the geocentre location and consequently similar annual amplitudes. For the minimally constrained configuration Greenbelt–Kitab, the mean of the uncertainties of the geocentre location were 2.3, 2.3 and 7.6 mm and RMS of the mean uncertainties were 1.9, 1.2 and 3.5 mm for the X, Y and Z components, respectively. For GA_IDS-2_Datum constrained configuration, the mean of the uncertainties of the geocentre location were 1.7, 1.7 and 6.2 mm and RMS of the mean uncertainties were 0.9, 0.7 and 2.9 mm for the X, Y and Z components, respectively. The mean of the differences of the two DORIS dynamic geocentre solutions with respect to the IDS-2 combination were 1.6, 4.0 and 5.1 mm with an RMS of the mean 21.2, 14.0 and 31.5 mm for the Greenbelt–Kitab configuration and 4.1, 3.9 and 4.3 mm with an RMS 8.1, 9.0 and 28.6 mm for the GA_IDS-2_Datum constraint configuration. The annual amplitudes for each component were estimated to be 5.3, 10.8 and 11.0 mm for the Greenbelt–Kitab configuration and 5.3, 9.3 and 9.4 mm for the GA_IDS-2_Datum constraint configuration. The two DORIS determined dynamic geocentre solutions were compared to the SLR determined dynamic solution (which was determined from the same process of the GA contribution to the ITRF2008 ILRS combination) gave mean differences of 3.3, −4.7 and 2.5 mm with an RMS of 20.7, 17.5 and 28.0 mm for the X, Y and Z components, respectively for the Greenbelt–Kitab configuration and 1.1, −5.4 and 4.4 mm with an RMS of 9.7, 13.3 and 24.9 mm for the GA_IDS-2_Datum configuration. The larger variability is reflected in the respective amplitudes. As a comparison, the annual amplitudes of the SLR determined dynamic geocentre are 0.9, 1.0 and 6.8 mm in the X, Y and Z components. The results from this study indicate that there is potential to achieve precise dynamically determined geocentre from DORIS.  相似文献   

11.
For the first time, the International DORIS Service (IDS) has produced a technique level combination based on the contributions of seven analysis centers (ACs), including the European Space Operations Center (ESOC), Geodetic Observatory Pecny (GOP), Geoscience Australia (GAU), the NASA Goddard Space Flight Center (GSFC), the Institut Géographique National (IGN), the Institute of Astronomy, Russian Academy of Sciences (INASAN, named as INA), and CNES/CLS (named as LCA). The ACs used five different software packages to process the DORIS data from 1992 to 2008, including NAPEOS (ESA), Bernese (GOP), GEODYN (GAU, GSC), GIPSY/OASIS (INA), and GINS (LCA). The data from seven DORIS satellites, TOPEX/Poseidon, SPOT-2, SPOT-3, SPOT-4, SPOT-5, Envisat and Jason-1 were processed and all the analysis centers produced weekly SINEX files in either variance–covariance or normal equation format. The processing by the analysis centers used the latest GRACE-derived gravity models, forward modelling of atmospheric gravity, updates to the radiation pressure modelling to improve the DORIS geocenter solutions, denser parameterization of empirically determined drag coefficients to improve station and EOP solutions, especially near the solar maximum in 2001–2002, updated troposphere mapping functions, and an ITRF2005-derived station set for orbit determination, DPOD2005. The CATREF software was used to process the weekly AC solutions, and produce three iterations of an IDS global weekly combination. Between the development of the initial solution IDS-1, and the final solution, IDS-3, the ACs improved their analysis strategies and submitted updated solutions to eliminate troposphere-derived biases in the solution scale, to reduce drag-related degradations in station positioning, and to refine the estimation strategy to improve the combination geocenter solution. An analysis of the frequency content of the individual AC geocenter and scale solutions was used as the basis to define the scale and geocenter of the IDS-3 combination. The final IDS-3 combination has an internal position consistency (WRMS) that is 15 to 20 mm before 2002 and 8 to 10 mm after 2002, when 4 or 5 satellites contribute to the weekly solutions. The final IDS-3 combination includes solutions for 130 DORIS stations on 67 different sites of which 35 have occupations over 16 years (1993.0–2009.0). The EOPs from the IDS-3 combination were compared with the IERS 05 C04 time series and the RMS agreement was 0.24 mas and 0.35 mas for the X and Y components of polar motion. The comparison to ITRF2005 in station position shows an agreement of 6 to 8 mm RMS in horizontal and 10.3 mm in height. The RMS comparison to ITRF2005 in station velocity is at 1.8 mm/year on the East component, to 1.2 mm/year in North component and 1.6 mm/year in height.  相似文献   

12.
13.
The DORIS instrument on Jason-2 is the first of a new generation. The satellite receivers have now seven simultaneous measurement channels, with synchronous dual frequency phase and pseudo-range measurements. These measurements are now described in a similar manner as GPS measurements and an extension of the RINEX 3.0 format has been defined for DORIS. Data are available to users with a shorter latency.  相似文献   

14.
Doppler Orbitography and Radiopositioning Integrated by Satellite (DORIS) is a tracking technique based on a one-way ground to space Doppler link. For Low Earth Orbit (LEO) satellites, DORIS shows a robust capability in terms of data coverage and availability, due to a wide and well-distributed ground network, where data are made available by the International Doris Service (IDS). However, systematic errors remain in the DORIS data, such as instabilities of the on-board clock due to radiation encountered in space, which limit the accurate determination of station positions.The DORIS on-board clock frequency stability is degraded by the increased radiation found in the region of the South Atlantic Anomaly (SAA) and has been shown to degrade station position estimation. This paper introduces a new model correction to the DORIS data for the frequency of the Jason-2 Ultra Stable Oscillator (USO), derived from the Time Transfer by Laser Link (T2L2) experiment (Belli and Exertier, 2018). We show that a multi-satellite DORIS solution including this T2L2-corrected data applied to the frequency modelling for The DORIS data, improves the estimation of station coordinates. We show the tie residuals with respect to collocated GPS stations are improved by several millimeters. We also demonstrate that the 117-day (Jason-2) draconitic signal in the geophysical parameters is reduced, implying that the origin of this signal is not just solar radiation pressure mis-modeling, but also radiation-induced clock perturbations on the Jason-2 DORIS Ultra-Stable-Oscillator (USO). Finally we demonstrate through comparisons with the International Earth Rotations and Reference Systems Service (IERS) C04 series for Earth Orientation Parameters (EOP), that the estimation of EOP is improved in both a Jason-2 DORIS-only and a multi-satellite DORIS solution for EOP.  相似文献   

15.
This paper gives an overview of the DORIS related activities at the Navigation Support Office of the European Space Operations Centre. The DORIS activities were started in 2002 because of the launch of the Envisat satellite where ESOC is responsible for the validation of the Envisat Precise Orbits and a brief overview of the key Envisat activities at ESOC is given. Typical orbit comparison RMS values between the CNES POE (GDR-C) and the ESOC POD solution is 6.5, 18.8 and 23.1 mm in radial-, along- and cross-track direction. In the framework of the generation of the ITRF2008 ESOC participated in the reprocessing of all three space geodetic techniques; DORIS, SLR, and GPS. Here the main results of our DORIS reprocessing, in the framework of the International DORIS Service (IDS), are given. The WRMS of the weekly ESOC solution (esawd03) for the 2004–2009 period compared to the IDS-1 combined solution is of the order of 12 mm. Based on the long time series of homogeneously processed data a closer look is taken at the estimated solar radiation pressure parameters of the different satellites used in this DORIS analysis. The main aim being the stabilization of the Z-component of the geocentre estimates. We conclude that the ESOC participation to the IDS ITRF2008 contribution has been beneficial for both ESOC and the IDS. ESOC has profited significantly from the very open and direct communications and comparisons that took place within the IDS during the reprocessing campaign.  相似文献   

16.
17.
DPOD2014: A new DORIS extension of ITRF2014 for precise orbit determination   总被引:1,自引:1,他引:0  
To support precise orbit determination of the altimetry missions, the International DORIS Service (IDS) regularly estimates the DPOD (DORIS terrestrial reference frame for Precise Orbit Determination) solution which includes mean positions and velocities of all the DORIS stations. This solution is aligned to the current realization of the International Terrestrial Reference Frame (ITRF) and so, can be seen as a DORIS extension of the ITRF. In 2016, moving to the IDS Combination Center, the DPOD construction scheme changed. The new DPOD solution is produced from a DORIS cumulative position and velocity solution. We present the new methodology used to compute DPOD2014 and its validation procedure. In order to present geophysical applications and interpretations of these results, we show two examples: (1) the Gorkha earthquake (M7.8 – April 2015) generates a 3-D mis-positioning of nearly 55?mm of the EVEB DORIS station at the Everest base camp 90?km from the epicenter. (2) Applying the results the DPOD2014 realization, we show that the most recent vertical velocity of Thule, Greenland is similar to that observed between 2006 and 2010, indicating further ongoing ice mass loss in the Thule region of northwest Greenland.  相似文献   

18.
Even if Satellite Laser Ranging (SLR) remains the fundamental technique for geocenter monitoring, DORIS can also determine this geophysical parameter. Gobinddass et al. (2009) found that part of the systematic errors at 118 days and 1 year can be significantly reduced by rescaling the current solar radiation pressure models using satellite-dependent empirical models. Here we extend this study to all DORIS satellites and propose a complete set of empirical solar radiation parameter coefficients. A specific problem related to SPOT-5 solar panel realignment is also detected and explained. New DORIS geocenter solutions now show a much better agreement in amplitude with independent SLR solutions and with recent geophysical models. Finally, the impact of this refined DORIS data strategy is discussed in terms of Z-geocenter monitoring as well as for other geodetic products (altitude of high latitude station such as Thule in Greenland) and Precise Orbit Determination. After reprocessing the full 1993.0-2008.0 DORIS data set, we confirm that the proposed strategy allows a significant reduction of systematic errors at periods of 118 days and 1 year (up to 20 mm), especially for the most recent data after 2002.5, when more DORIS satellites are available for geodetic purposes.  相似文献   

19.
There is a lack of independent ionospheric data that can be used to validate GPS imaging results at mid latitudes over severe storm times. Doppler Orbitography and Radio positioning Integrated by Satellite (DORIS), a global network of dual-frequency ground to satellite observations, provides this missing data and here is employed as verification to show the accuracy of the ionospheric GPS images in terms of the total electron content (TEC). In this paper, the large-scale ionospheric structures that appeared during the strong geomagnetic storm of 20 November 2003 are reconstructed with a GPS tomographic algorithm, known as MIDAS, and validated with DORIS TEC measurements. The main trough shown in an extreme equatorward position in the ionospheric imaging over mainland Europe is confirmed by DORIS satellite measurements. Throughout the disturbed day, the variations of relative slant TECs between DORIS data and MIDAS results agree quite well, with the average of the mean differences about 2 TECu. We conclude that as a valuable supplement to GPS data, DORIS ionospheric measurements can be used to analyse TEC variations with a relatively high resolution, ∼10 s in time and tens of kilometres in space. This will be very helpful for identification of some highly dynamic structures in the ionosphere found at mid-latitudes, such as the main trough, TID (Travelling Ionospheric Disturbances) and SED (Storm Enhanced Density), and could be used as a valuable auxiliary data source in ionospheric imaging.  相似文献   

20.
First results in the area of studying the influence of gravity field on the degree of ordering of directionally solified eutectict are presented. As the model complex-forming melts, PbCl2 and its eutectic with AgCl was chosen. Directional solidification of the mentioned eutectic was realised under conditions of zero, normal and increased gravity. It was shown that increasing level of gravity results in a marked improvement of the degree of spacial ordering of the lamelar structure.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号