首页 | 本学科首页   官方微博 | 高级检索  
     检索      

民用飞机直接维修成本分配模型研究
引用本文:刘彦波,郑蓝,贾宝惠.民用飞机直接维修成本分配模型研究[J].航空工程进展,2022,13(3):120-126.
作者姓名:刘彦波  郑蓝  贾宝惠
作者单位:中国商用飞机有限责任公司 上海飞机设计研究院,中国商用飞机有限责任公司 上海飞机设计研究院,中国民航大学 航空工程学院
基金项目:国家自然科学基金(U2033209)
摘    要:降低民用飞机直接维修成本是提高飞机经济性、增强市场竞争力的重要途径。以民用飞机研制阶段在很大程度上决定其维修成本的高低为背景,在分析相关文献研究成果的基础上,构建可反映民用飞机成本特性的设计参数结构层次图,基于 TOPSIS-灰色关联法计算类似机型的相对相似度,进行民用飞机直接维修成本分配;将类似机型典型系统直接维修成...

关 键 词:民用飞机  维修性设计  直接维修成本  TOPSIS-灰色关联法
收稿时间:2021/2/19 0:00:00
修稿时间:2021/4/4 0:00:00

Study of Allocation Model of Civil Aircraft Direct Maintenance Cost Based on the TOPSIS-Gray Correlation Method
LIU Yan-bo,ZHENG Lan and JIA Bao-hui.Study of Allocation Model of Civil Aircraft Direct Maintenance Cost Based on the TOPSIS-Gray Correlation Method[J].Advances in Aeronautical Science and Engineering,2022,13(3):120-126.
Authors:LIU Yan-bo  ZHENG Lan and JIA Bao-hui
Institution:Shanghai Aircraft Design and Research Institute,Commercial Aircraft Corporation of China Ltd,,
Abstract:In order to reduce direct maintenance costs of civil aircraft, which is an important way to improve aircraft economics and enhance market competitiveness. Based on the background that the maintenance cost is largely determined in the development stage of civil aircraft, by constructing a hierarchical diagram of the design parameter structure that reflects the cost characteristics of civil aircraft, the TOPSIS-Grey correlation method model is established to calculate the relative similarity of similar aircraft and to carry out the direct maintenance cost allocation of civil aircraft. The direct maintenance cost data of typical systems of similar aircraft types is input into the allocation model for verification. The results show that the model in the article can predict the system-level direct maintenance cost of civil aircraft well, and the calculation result can meet the engineering requirements, which can provide a reference for predicting the direct maintenance cost of the newly developed aircraft.
Keywords:civil aircraft  maintainability design  direct maintenance cost  TOPSIS-Grey association method
点击此处可从《航空工程进展》浏览原始摘要信息
点击此处可从《航空工程进展》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号