首页 | 本学科首页   官方微博 | 高级检索  
     检索      

BDS-3 PPP模糊度固定实现及精度评估
引用本文:肖正阳,肖国锐,刘长建,宋开放,魏浩鹏,李沛功.BDS-3 PPP模糊度固定实现及精度评估[J].导航定位于授时,2024,11(2):122-132.
作者姓名:肖正阳  肖国锐  刘长建  宋开放  魏浩鹏  李沛功
作者单位:1. 信息工程大学地理空间信息学院;2. 中国测绘科学研究院
基金项目:国家自然科学基金(42274045,41904039);;河南省自然科学优秀青年基金(232300421105);;中国博士后科学基金面上项目(2023M733285);
摘    要:精密单点定位(PPP)模糊度固定(AR)能够显著提升精密定位的收敛速度和精度。通过在BDS-2和BDS-3之间添加系统间偏差的方法实现BDS-3的模糊度固定,并基于全球MGEX测站静态、仿动态数据和车载实验数据全面评估了BDS-3模糊度固定的效果。结果表明,相对于浮点解,BDS-3 PPP模糊度固定能够显著提升PPP的精度,在东北天3个方向上静态解算精度提升依次为37.4%、26.2%和20.1%;仿动态解算精度提升依次为38.3%、27.2%和11.1%;车载动态实验BDS-3模糊度固定精度在三维方向上综合提升为40.4%。此外,模糊度固定后,以浮点解稳定后的两倍定位精度为基准,在东北天方向上,静态定位时间提升程度依次为63.5%、64.0%和40.3%;仿动态定位时间提升程度依次为58.7%、56.8%和25.4%;车载实验在三维方向的收敛时间为30.0 min。以上结果证明了所提方法的有效性及BDS-3模糊度固定的性能提升。

关 键 词:北斗二号系统  北斗三号系统  系统间偏差  精密单点定位模糊度固定

Implementation of BDS-3 precise point positioning ambiguity resolution and accuracy evaluation
XIAO Zhengyang,XIAO Guorui,LIU Changjian,SONG Kaifang,WEI Haopeng,LI Peigong.Implementation of BDS-3 precise point positioning ambiguity resolution and accuracy evaluation[J].Navigation Positioning & Timing,2024,11(2):122-132.
Authors:XIAO Zhengyang  XIAO Guorui  LIU Changjian  SONG Kaifang  WEI Haopeng  LI Peigong
Institution:Institute of Geospatial Information, Information Engineering University, Zhengzhou 450001, China;Institute of Geospatial Information, Information Engineering University, Zhengzhou 450001, China; Chinese Academy of Surveying and Mapping, Beijing 100039, China
Abstract:Precise point positioning (PPP) ambiguity resolution (AR) can significantly improve the accuracy and convergence speed of precision positioning. The ambiguity resolution of BDS-3 is achieved by adding internal system bias between BDS-2 and BDS-3, and the effect of BDS-3 PPP ambiguity resolution is comprehensively evaluated based on static data, simulated kinematic data from MGEX stations and real-time data from vehicle-borne experiments. The results show that, compared with the float solution, the BDS-3 PPP ambiguity resolution can significantly improve the accuracy and convergence speed of PPP, with the static accuracy improvement of about 37.4%, 26.2%, and 20.1% in the three directions of the east, north and up, respectively. For the simulated kinematic BDS-3 PPP ambiguity resolution the accuracy is improved by about 38.3%, 27.2%, and 11.1%. For real-time data, the accuracy after ambiguity resolution is improved by 40.4% integrated in the 3D direction. In addition, based on twice the positioning accuracy of the float solution stabilized in the east, north, and up directions after BDS-3 PPP ambiguity resolution, the static positioning time can be improved by 63.5%, 64.0%, and 40.3%, respectively and the simulated kinematic positioning time can be improved 58.7%, 56.8% and 25.4%, respectively and the convergence time of the vehicle-borne experiment in the 3D direction is 30.0 min. The above results prove the effectiveness of the proposed method and the improvement of PPP ambiguity resolution.
Keywords:BDS-2  BDS-3  Internal system bias (ISB)  Precise point positioning ambiguity resolution (PPP AR)
点击此处可从《导航定位于授时》浏览原始摘要信息
点击此处可从《导航定位于授时》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号