循环预冷试验中测量系统干扰问题分析与措施
引用本文:李山峰,汤伟.循环预冷试验中测量系统干扰问题分析与措施[J].火箭推进,2014,40(4):77-82.
作者姓名:李山峰  汤伟
作者单位:北京航天试验技术研究所,北京,100074
摘    要:针对某型号发动机循环预冷试验中的电机干扰问题,通过研究试验测量系统信号线连接模式,测量系统及电机系统供电模式,确定了相邻导线耦合/公共地线耦合及公用电源线耦合3种可能的耦合途径.结合对试验系统的分析,逐一研究了3种干扰耦合途径的耦合原理,并进行了实验验证,确定了循环电机干扰的耦合机理;通过研究干扰抑制方法,结合本试验系统,制定了适合本系统干扰模式的干扰抑制方法,切断了干扰耦合途径,彻底解决了干扰问题.

关 键 词:测量系统  电机  干扰  耦合途径

Analysis and solution for interference with measurement system in cycle precooling test
LI Shan-feng,TANG Wei.Analysis and solution for interference with measurement system in cycle precooling test[J].Journal of Rocket Propulsion,2014,40(4):77-82.
Authors:LI Shan-feng  TANG Wei
Institution:(Beijing Institute of Aerospace Testing Technology, Beijing 100074, China)
Abstract:For motor interference problems in cycle pre-cooling tests, the three possible couplingpaths of coupling between adjacent wires, common earth wire t.-,upling and public utility power linecoupling were determined by studying the signal line connection mode, the measuring system and themotor system power mode of test measurement system. Combined with analysis of the testing system,the coupling principles of the three interference coupling paths were researched one by one, theexperimental verification was conducted and the coupling mechanism of the loop motor interferencewas determined. With the research of interferencemethod suitable for the testing system interferencesystem, the interference coupling ways were cutsuppression method, an interference suppressionpattern was determined by means of the testingoff, and the interference problem was solvedcompletely, by which progress of engine cycle pre-cooling tests was ensured. The debugging method,verification means and the methods to suppress the interference have a certain reference value forsolving the similar problems faced by other testing benches.
Keywords:measurement system  motor  interference  coupling path