首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   4篇
  免费   0篇
航空   1篇
航天技术   1篇
综合类   1篇
航天   1篇
  2014年   1篇
  2011年   1篇
  1998年   1篇
  1984年   1篇
排序方式: 共有4条查询结果,搜索用时 31 毫秒
1
1.
The matched filter ambiguity function is presented for a burst waveform composed of repeated subbursts, each one of which consists of N pulses in which the phase is varied quadratically from pulse to pulse. The resulting ambiguity function exhibits small residual ambiguities along the delay axis separated by the reciprocal of the pulse repetition frequency (PRF). A cross-ambiguity function is derived which reduces these ambiguities to zero amplitude. A third cross-ambiguity function is presented for a receiver matched to a generalized Hamming weighted repeated quadratic burst. The location in the delay/Doppler plane of the waveform ambiguities for these waveforms is compared with that of an uncoded pulse burst.  相似文献   
2.
运用CFD数值计算和平面叶栅的吹风试验对蒸汽涡轮导向叶片的端墙效应进行了研究,并在一试验蒸汽涡轮上得到了验证。由于本文研究给出了较高的效率,进一步实施了大量的三维数值模拟,该结果显示使用这一叶型对涡轮有一定的改善,尤其在涡轮叶片尖部有端墙时。在试验蒸汽涡轮上测量了尖部、根部均有端墙和仅尖部有端墙的不同效应,结果表明尖部有端墙时效率有所提高,然而当叶片有直端墙时,效率反而会下降。  相似文献   
3.
The dosimetry of cosmic rays was performed during the first experimental flight of the IBIS facility. Different thermoluminescent detectors (TLD) have been used to measure the contribution of the low linear energy transfer component (LET < 10 keV/micrometer) and plastic nuclear track detectors (PNTD) for the high linear energy tranfer (LET) component. Several parameters of tracks have been measured to determine the LET spectra of primary and secondary charged particles. The total absorbed dose rate (TLD+PNTD) during the flight was 0.23 mGy/day and the dose equivalent rate using the ICRP 60 was 0.52 mSv/day. The corresponding mean quality factor was 2.4. These results are in agreement with those obtained aboard the MIR station with a tissue equivalent proportional counter.  相似文献   
4.
SSETO is the result of a phase-A study in context of the small satellite program of the University of Stuttgart that demonstrates the capability of a university institute to build a small satellite with a budget of 5 million Euro. The satellite will be capable of observing exoplanets in a Neptune–Earth scale and obtaining data of interstellar dust. Due to a system failure of NASA?s Kepler mission, there is currently (October 2013) a lack of satellites searching for exoplanets. This paper details the design of subsystems and payload, as well as the required test tasks in accordance with the mission profile at a conceptional level. The costs for standard spacecraft testing and integration tasks are included, but not those of launch, ground support, operations and engineer working hours.  相似文献   
1
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号